Introduction; Initial Inspection - Keysight EPM Series Installation Manual

Power meters
Table of Contents

Advertisement

1
Getting Started

Introduction

The Keysight N1913/1914A EPM Series Power Meter Installation Guide shows you
how to:
– physically check the power meter.
– adjust the carrying handle.
– switch it on and confirm the meter passes the power-on self test
– connect it to a U2000 Series power sensor.
– connect it to a 8480, N8480 Series or E-Series power sensor.
– perform a zero and calibration routine on a 8480, N8480 Series, or E-Series
– perform a zero routine on U2000 Series power sensors.
– make connections to the rear panel.
– use the Keysight IO Libraries Suite to configure the remote programming
– attach the rack mounting kits (supplied with Option 908 or Option 909).
Both single and dual channel power meters with a variety of rear panel
NOTE
configurations have been used for the illustrations in this guide. Your power
meter may differ in details to those shown.

Initial inspection

Please inspect the shipping container for damage. If the shipping container or
packaging material is damaged, it should be kept until the contents have been
checked mechanically and electrically. If there is mechanical damage, notify the
nearest Keysight Technologies office. Keep the damaged shipping materials (if
any) for inspection by the carrier and a Keysightrepresentative. If required, you can
find a list of Keysight Sales and Service Offices.
Please ensure you have read and understood the preceding safety information
before you proceed.
20
power sensor.
interfaces.
Keysight N1913/1914A Installation Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

N1913N1914a

Table of Contents