Schedule - ICP DAS USA iNS-308 User Manual

8-port 10/100base-tx iot switch
Table of Contents

Advertisement

iNS-308 User Manual

4.2 Schedule

On the Schedule page, you can manage the power schedule for PoE powered device(s) in a week.
The first section provides PoE Port select、schedule Enable/Disable and reset delay configure
interface.
Whan, Power On Schedule set to "Enable" and Power schedule setup is complete, must click "Update
Settings" button to seved and activation.
* Configure method please refer to 5.2 Power Schedule chapter
Copyright © 2022 ICP DAS CO., Ltd. All Rights Reserved.
- 18 -

Advertisement

Table of Contents
loading

Table of Contents