Download Print this page

3form Dello SimpleSpec 200.86 Installation Manual page 6

Advertisement

Ready To Go
Dello SimpleSpec 200.86
Installation
1
Install Ceiling Anchor for the First Cable Assembly cont...
d
Place a washer under the screw head.
g
Hollow Substrate Installation
Metal
Studs
Drill Ø3/4" (19mm) hole. Minimum
clearance behind wall = 17/8" (48mm)
For more information, please visit 3-form.com or call 800.726.0126
June 2019 | MAn-RTG-200-08 | ReV 002 © 2019 3form, Inc. All rights reserved.
e
Torque the screw to 15 nm.
h
Position the metal channel parallel
with the plastic legs. Insert the metal
channel through the drilled hole into
the wall cavity.
tm
Installation Manual
f
Remove screw.
i
Pull the metal channel firmly against the
inner wall cavity by tugging the plastic
pull ring.
Metal
Studs
6

Advertisement

loading