Judo PIPE-CARE SYSTEM Installation And Operating Instructions Manual
Judo PIPE-CARE SYSTEM Installation And Operating Instructions Manual

Judo PIPE-CARE SYSTEM Installation And Operating Instructions Manual

Micro leakage protection system 3/4" - 1 1/4"

Advertisement

Quick Links

Installation and operating instructions
JUDO PIPE-CARE SYSTEM
Micro leakage protection system ¾" - 1¼"
Valid for: EU-countries and Switzerland
Language: English
Read before use and store!

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PIPE-CARE SYSTEM and is the answer not in the manual?

Questions and answers

Summary of Contents for Judo PIPE-CARE SYSTEM

  • Page 1 Installation and operating instructions JUDO PIPE-CARE SYSTEM Micro leakage protection system ¾" - 1¼" Valid for: EU-countries and Switzerland Language: English Read before use and store!
  • Page 2 D-71351 Winnenden uct. You have purchased a state-of-the- art device. It has been carefully checked Email: info@judo.eu • judo.eu prior to delivery. Nevertheless, if diffi- culties occur, please contact the closest customer service (see chapter Customer Office address: service).
  • Page 3: Table Of Contents

    Conversions, changes....23 4.10 Maintenance, repair, spare parts 4.11 Temporary removal of the device.......... 23 Remote control and Remote transmission of messages..24 External messages..... 24 Integration in building control systems........24 Warning message / fault... 25 1703593 • 2022/10 JUDO JPCS...
  • Page 4: Safety

    16 bar (even for a not fully installed! short time)! Never put your finger in the open- ing on the rear side of the device! Nominal pressure PN 16 JUDO JPCS 1703593 • 2022/10...
  • Page 5 (in particular a gas or electrically operated instantaneous water heater For the installation of the device in or a heating boiler), the manufacturer's domestic water piping, only use the sup- instructions for the water heater must 1703593 • 2022/10 JUDO JPCS...
  • Page 6: Symbols Used

    1¼" DN 32 Normative basics This device has been designed and manufactured according to DIN 3553 (Leakage protection systems • with sensors and automated shut-off devices, requirements and tests) JUDO JPCS 1703593 • 2022/10...
  • Page 7: Product Information

    Fig. 2: View from below: LAN cable connection The LAN connection is available if the INFO_NO_HEADER connectivity module (available as an accessory) has been installed. 1703593 • 2022/10 JUDO JPCS...
  • Page 8: Materials Used

    - Accept value and save, then jump The device can be integrated in building one menu level back control systems (see chapter 5). - Acknowledge message Materials used The materials and substances used are resistant to the physical, chemical and cor- JUDO JPCS 1703593 • 2022/10...
  • Page 9: Installation

    If no bypass valve is installed, a If the installation is twisted, a func- shut-off valve must be installed INFO_NO_HEADER tioning of the device is not possible. upstream and downstream of the 1703593 • 2022/10 JUDO JPCS...
  • Page 10: Installation Of The Device

    Placing and engaging the device Select the tightening torque (about UNIT (fastening principle) 4 Nm) so that the seal is effective and the device is not damaged or Feed screws through Turn clockwise to engage strained! JUDO JPCS 1703593 • 2022/10...
  • Page 11: Commissioning

    “L”: The device is in learning mode (see firm with the OK key. • chapter 4.4.3). Possible settings The following settings can be made via the key Menu (Selection Setting): Submenu Setting item Language German, English, French, Dutch, Italian 1703593 • 2022/10 JUDO JPCS...
  • Page 12 (see chapter4.2.1). Auto testing (micro leakage testing) Backlight 80 % Contrast Tone - leakage warning Tone - fault Message relay Normally closed Upon resetting to the factory settings, INFO_NO_HEADER the above mentioned settings are recreated. JUDO JPCS 1703593 • 2022/10...
  • Page 13: Menu Key - Selectable Functions And Settings

    Confirm the desired sub-menu item with the OK key. Then use the keys ▲ or ▼ to select the desired setting and confirm with the OK button. The desired setting is saved. 1703593 • 2022/10 JUDO JPCS...
  • Page 14 Message only Auto testing Tot. water Input (LS) Message+close quantity Floor sensor Device number Input (LS) Service no. Sleep mode History Operating data Input (LS) Control unit SW-Version Close mode Info Control unit HW-Version Water flow JUDO JPCS 1703593 • 2022/10...
  • Page 15 The leakage protection system opens for water supply. The default status dis- To end play appears. press <OK> The countdown of the displayed sleep mode time runs. During this time, limit value monitoring is paused. 1703593 • 2022/10 JUDO JPCS...
  • Page 16 OK Press Menu key. key. Select Vacation mode using the arrow Navigate to Vacation mode Leakage keys and confirm with the OK key. The protection using the arrow keys and following appears on the display: JUDO JPCS 1703593 • 2022/10...
  • Page 17 Performing small leakage testing automatically Micro leakage testing can also be per- formed automatically; in this case testing is performed daily without anything further to The following setting is necessary for this: Press the menu key. 1703593 • 2022/10 JUDO JPCS...
  • Page 18 The following settings can be selected for the occurrence of a micro leakage that has been detected via automatic micro leakage testing: Auto testing Micro leakage message on the display Message+close • The selected setting is saved. JUDO JPCS 1703593 • 2022/10...
  • Page 19: Setting Limit Values

    It is also possible to operate such devices using sleep mode of the The display returns to the operating dis- micro leakage protection system. play. If no micro leakage has been detected, the display alternates between 1703593 • 2022/10 JUDO JPCS...
  • Page 20 During learning mode, the following are inside the ranges specified in the table output to the display in alternation: (select via arrow key, confirm with OK). Learning mode is terminated JUDO JPCS 1703593 • 2022/10...
  • Page 21: Automatic Operation

    If during drawing of water one of these limits is exceeded, the device shut-off Withdrawal time valve closes. exceeded Automatic shut-off of the water supply CAUTION After the leakage protection has closed due to a limit being 1703593 • 2022/10 JUDO JPCS...
  • Page 22: Emergency-Open Function

    • Measured values (actual water flow) Unplug the power supply unit. • Service department telephone number Take off the casing in a forward direc- • (+49 7195 692-0) tion (see Figure 7). Manufacturer • JUDO JPCS 1703593 • 2022/10...
  • Page 23: Conversions, Changes

    After unscrewing the device from the built- in rotary flange for maintenance or repair, leakage might occur if not properly re- attached. For reattachment, observe the instructions for mounting the device (see 3.3). 1703593 • 2022/10 JUDO JPCS...
  • Page 24: Remote Control And Remote Transmission Of Messages

    EIB / KNX, LCN or LON) via the floating sig- nal relay. The potential-free relay is connected to a binary bus coupler. In this way, fault messages can be for- warded to the building control system. JUDO JPCS 1703593 • 2022/10...
  • Page 25: Warning Message / Fault

    Water flow exceeded Hole or crack in a pipe or hose; Water tap or flushing box Withdrawal time valve not fully closed. exceeded To open press <OK> Table 3: Help for warning / fault messages 1703593 • 2022/10 JUDO JPCS...
  • Page 26 OK key. Water flow exceeded Withdrawal time exceeded Current limit XXXX l/h To open press <OK> For setting press <▲/▼> Table 3: Help for warning / fault messages JUDO JPCS 1703593 • 2022/10...
  • Page 27 No water flow for mode off). display. 15 days If message incorrect: Arrange for a functional test by the installer or JUDO service. The device has a technical Inform the installer or defect. JUDO service. Attention! Fault ..Table 3: Help for warning / fault messages 1703593 •...
  • Page 28: Servicing

    Press OK key. • Disconnect the power supply unit from the socket and plug back in after about 5 sec- • onds. When contacting JUDO service always specify the device ID (identification number) INFO_NO_HEADER (see chapter 4.8). Servicing Warranty and maintenance...
  • Page 29: Technical Data

    Technical data Technical data JUDO PIPE-CARE Micro leakage protection Pipe connection area ¾" - 1¼" SYSTEM system The water to be filtered must comply with the European Drinking Water Directive. Information about: Value Maximum ambient temperature 30 °C Maximum water temperature 30 °C...
  • Page 30 Technical data Information about: Value Protection class IP 22 1) Nominal pressure (= pressure level that the appliance meets) JUDO JPCS 1703593 • 2022/10...
  • Page 31: Installation Dimensions

    Table 4: Dimensions without unit in mm A Installation length B Width of the device C Height above the pipe middle D Height below the pipe middle E Installation depth up to the pipe middle 1703593 • 2022/10 JUDO JPCS...
  • Page 32: Connection Options

    (LS) and confirm. input: Select one of the following settings and confirm. JUDO floor sensor (up to 9 pcs) • Input (LS) The floor sensor triggers in the event of a water accumulation on the ground;...
  • Page 33: Accessories

    • 5 metres, order No. 8203552 JUDO extension cable for floor sensor, • 10 metres, order No. 8203553 JUDO cable for external fault signal, 10 • metres, order No. 2200717 JUDO Connectivity-Module, for con- • necting the appliance to a home net-...
  • Page 34: Electronic Control Unit

    Technical data Electronic control unit JUDO JPCS 1703593 • 2022/10...
  • Page 35 Technical data 8.4.1 Connection potential-free message Function: Normally Closed Contact 1-2: operating • 2-3: zero-current / fault / leakage alarm • Function: Normally Open Contact 1-2: zero-current / fault / leakage alarm • 2-3: operating • 1703593 • 2022/10 JUDO JPCS...
  • Page 36: Spare Parts

    Technical data Spare parts JUDO PIPE-CARE SYSTEM ¾" - 1¼" JUDO JPCS 1703593 • 2022/10...
  • Page 37: Disposal

    Packaging waste is to be sent to the local recycling system. To protect environment, old appliances must not be disposed of with household waste. Instead, use the local collection and return points, which are committed to free and environmentally sound disposal. 1703593 • 2022/10 JUDO JPCS...
  • Page 38: Ec Conformity Declaration

    EC Conformity Declaration 484 / 10.22 Manufacturer: JUDO Wasseraufbereitung GmbH Address: Hohreuschstraße 39 - 41, D-71364 Winnenden JUDO PIPE-CARE SYSTEM ¾" - 1¼" Product description: Micro leakage protection system • EC Directive: Restriction of the use of certain hazardous 2011/65/EU...
  • Page 39: Maintenance Log

    Maintenance log Maintenance log Product designation: Order number: Serial number: Date Work activities performed Company / Signa- ture 1703593 • 2022/10 JUDO JPCS...
  • Page 40: Customer Service

    Industriestrasse 15 • CH-4410 Liestal Phone +41 (0)61 906 40 50 • Fax +41 (0)61 906 40 59 E-mail: info@judo-online.ch • judo-online.ch JUDO Wasseraufbereitung GmbH • Filiaal - Filiale Benelux Laarbeeklaan - Av. du Laerbeek, 72 A1 • B-1090 Brussel-Bruxelles BENELUX Phone +32 (0)24 60 12 88 •...

This manual is also suitable for:

Jpcs 3/4Jpcs 1Jpcs 1 1/4814004881400498140050

Table of Contents