Ironmaster PRO Stand Assembly & Operating Instructions

Ironmaster PRO Stand Assembly & Operating Instructions

Advertisement

Quick Links

Congratulations on your purchase of this fine Ironmaster product. Be sure to read and understand the
operating instructions to achieve the best performance and avoid injury.

Bolt Pack contents

4x Industrial Caster (2x locking)
8x Caster axle spacers
20x M8 Washers
8x M8 Nylock Nut
8x M8 x 65mm bolt
4x Top shelf bolt M8 x 20mm
2x 17mm and 1x 19mm wrench
required for assembly
(not included)
Assembly & Operating Instructions
Ironmaster PRO Stand

Description:

This stand is designed to hold Quick-Lock Dumbbell
equipment, weight plates, locking screws, kettlebells,
etc. Heavy duty, rated for 1000 lbs load.
It is recommended to keep small stacks of weight
plates on the top between the dumbbells for speedy
weight changes. There are many options for storage
and use.
Use care when rolling PRO STAND with heavy loads.
Keep the two wheel locks engaged when stationary.

Box Contents

BOTTOM SHELF
TOP SHELF
2x PRO STAND SIDE

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PRO Stand and is the answer not in the manual?

Questions and answers

Summary of Contents for Ironmaster PRO Stand

  • Page 1 Assembly & Operating Instructions Ironmaster PRO Stand Congratulations on your purchase of this fine Ironmaster product. Be sure to read and understand the operating instructions to achieve the best performance and avoid injury. Description: This stand is designed to hold Quick-Lock Dumbbell equipment, weight plates, locking screws, kettlebells, etc.
  • Page 2 Assembly: Step 1: After confirming all parts are present, locate 4x M8 x 65mm bolts, 8x M8 Washers, 1x PRO STAND SIDE and BOTTOM SHELF. Next con- nect BOTTOM SHELF and PRO STAND SIDE together. Do not tighten bolts until entire assembly is complete.
  • Page 3 BRACKET and PRO STAND SIDE holes to align proper- ly. Once Assembly is complete, tighten all bolts. Step 4: Turn Completed PRO STAND upside down to install 8x CASTER AXLE SPACERS and CASTERS. Note 2x CASTERS have foot locking lever. Slide AXLE SPACER onto each CAST- ER and then thread Casters into 4 corners of PRO STAND SIDES.
  • Page 4 10 years for frame and structural components. Shipping costs are not included in the warranty and some items may need to be sent to Ironmaster for repair or replacement. I n stallation of any parts and labor involved is not included. The warranties described above shall be the sole and exclusive remedy available to the pu rchaser. Correction of...

This manual is also suitable for:

3120

Table of Contents