Establish A Connection - Baudcom BD-ONT-114G-BE User Manual

4ge+poe xpon sfu onu
Table of Contents

Advertisement

Shanghai Baudcom Communication Device Co.,Ltd
4. Check all signal levels and services on all SFU communication ports.
Equipment Installation and Adjustment:
Install the SFU on a horizontal surface (bench top)
Place the SFU on a clean, flat, sturdy work surface. You must keep the clearance of each side
of the device at least 10 cm to dissipate heat。
Mount the SFU on a vertical surface (hanging on the wall)
You can mount the SFU on a vertical surface using the mounting holes at the bottom of the
ONU chassis and two flat-headed wood screws. .
a) Insert screws into walls. The screw position must be on the same level and the distance
between them must be 165mm. Leave at least 6mm of space between the nut and the wall。
b) Hang the SFU on the screw through the mounting hole。

2.3 Establish a connection

Establish a wired connection
Connect the PC to the Ethernet port of the SFU using the RJ-45 CAT5 cable.
Website: http://www.baudcom.com.cn
Email: info@baudcom.com.cn
6
Tel: +86 21 37709251

Advertisement

Table of Contents
loading

Table of Contents