HYDRAULIC FITMENT
Refer to the attached drawing UCA-H01 as support to the detailed instructions for further
information.
STEP
INSTRUCTION
1
To mount the Flow Controller
Subassembly, Part 10A, to the rear
of the header front, on the left-hand
side, between the draper belt
hydraulics and FeedStorm hydraulic
motor, prepare the surface, by
removing paint coating in location
for welding, as pictured.
2
Isolate the header battery if the
header front is currently attached
to the header.
Weld the flow controller bracket in
position.
Paint black with spray can supplied.
3
Once the paint has dried, mount the
Flow Controller to the Bracket with
the fastenings supplied loose.
4
Connect the hydraulic line inlet, H4,
of drawing UCA-H01, to the existing
draper belt return line. Use the
hydraulic fitting supplied loose, 10C.
REFERENCE IMAGE
18