Mounting (For Trained Installers) - NEC E758 User Manual

Large format display
Hide thumbs Also See for E758:
Table of Contents

Advertisement

Mounting (for Trained Installers)

WARNINGE::
Please refer to

Carefully inspect the location where the unit is to be mounted. Not all walls or ceilings are capable of supporting the weight of
the monitor.
The weight of this monitor is provided in the specifications (see
The product warranty does not cover damage caused by improper installation, re-modeling, or natural disasters.
Failure to comply with these recommendations could result in voiding the warranty.
To ensure safe installation, use two or more brackets to mount the unit. Mount the unit to at least two points on the installation
location.
Mounting bracket
WARNINGE::
Please refer to the

Please note the following when mounting on a wall or ceiling:
We recommend mounting interfaces that comply with UL1678 standard in North
America.
Prior to mounting, inspect the installation location to ensure that it is strong enough
to support the weight of the unit so that the unit will be safe from harm.
For detailed information, refer to the instructions included with the mounting
equipment.
We strongly recommend using the screws as shown below.
If using screws longer than below mentioned, check the depth of the hole.
Screw Size
(A)
M8 (4 pcs)
16-18 mm
NOTEE:
When used in a video wall configuration for a long time, a slight expansion of the monitors may happen due to

temperature changes. It is recommended that a gap of over one millimeter is kept between adjacent monitor
edges.
"WARNING
9".
"Important Information"
Bracket Hole
(B)
(C)
≤ Ø 12 mm
"E758" on page
65,
section.
No Thread
(D)
6 mm
> 1.0 mm
English - 15
"E868" on page
66).
Monitor
No thread (D)
Diameter (C)
(B)
Recommended Fasten Force
950-1600 N•cm
Gap
Mounting
bracket
Washers
Screw (A)
Thickness of
the bracket
and washers

Advertisement

Table of Contents
loading

This manual is also suitable for:

E868

Table of Contents