This spreader is designed to dispense ice-control
materials on residential or commercial properties.
Using this product for purposes other than its intended
use could prove dangerous to you and bystanders.
Read this information carefully to learn how to operate
and maintain your product properly and to avoid
injury and product damage. You are responsible for
operating the product properly and safely.
Visit
www.bossplow.com
operation training materials, accessory information,
help finding a dealer, or to register your product.
Whenever you need service, genuine BOSS parts, or
additional information, contact an Authorized BOSS
Dealer or BOSS Technical Service (1-800-286-4155) .
Safety
Improperly using and maintaining the equipment
can result in injury. To reduce the potential for
injury, comply with these safety instructions
and always pay attention to the safety-alert
symbol
, which means Caution, Warning, or
Danger—personal safety instruction. Failure to
comply with the instruction may result in personal
injury or death.
Preparation
Ensure that only trained personnel install and
perform maintenance on the equipment.
Always wear appropriate personal protective
equipment when loading, unloading, and servicing
the spreader. Wear substantial, slip-resistant
footwear, eye protection, and respiratory
protection.
Carefully read and follow the chemical warning
labels and safety data sheets (SDSs) for all
chemicals used, and protect yourself according to
the chemical manufacturer's recommendations.
© 2022—BOSS Products
P.O. Box 787
Iron Mountain, MI 49801
80lb and 100lb Walk-Behind Spreader
Part No. WBS28080
Part No. WBS28100
for product safety and
Register at www.bossplow.com.
Operation
Read the Owner's Manual before operating or
servicing the spreader.
Overloading the spreader could result in an
accident or damage. Never exceed the capacity of
the spreader.
This spreader is restricted to the use of specified
materials only. Do not run other materials through
the spreader.
Stop the spreader before filling, servicing, or
cleaning it.
Keep bystanders and pets away from the machine
during operation.
Do not climb into or ride on the spreader.
Keep your hands, feet, and clothing away from
moving parts and mounting points.
When transporting the spreader, ensure that it is
properly secured. Instructions are available at
www.bossplow.com.
Do not store material in the hopper.
Original Instructions (EN)
Printed in the USA
All Rights Reserved
Form No. WBS28051 Rev B
Owner's Manual
*WBS28051*

Advertisement

loading
Need help?

Need help?

Do you have a question about the WBS28080 and is the answer not in the manual?

Questions and answers

Summary of Contents for Boss Snowplow WBS28080

  • Page 1 Form No. WBS28051 Rev B 80lb and 100lb Walk-Behind Spreader Part No. WBS28080 Part No. WBS28100 Owner's Manual Operation This spreader is designed to dispense ice-control materials on residential or commercial properties. • Read the Owner’s Manual before operating or Using this product for purposes other than its intended servicing the spreader.
  • Page 2 Setup Loosely install the nut removed in Step 10. Install the drive wheel onto the axle and align the spring clip holes. Install the spring clip through the wheel and axle. Fold the spring clip to ensure that it will not fall out.
  • Page 3 Calibrating the Spreader Installing the Deflector Pull the control lever to the closed position. Place the clips on the deflector frame. Ensure that the shut off plate is closed all the way. Tighten the nut on the control rod: • 80lb spreader—lower •...
  • Page 4 g397374 Figure 7...
  • Page 5: Operation

    Operation Changing the Handle Height g397093 Figure 8 2. Tall position 1. Standard position 3. Short position...