Operation; Self Test - ABB CP420B Installation And Operation Manual

Table of Contents

Advertisement

Operation

6
Operation
6.1

Self Test

Once the operator terminal is turned on, it will automatically execute a self-test
to check its hardware. The results of the self-test will be displayed on the screen
according to the following picture.
If any of tests does not pass the self-test, it will be noted with "Failed" next to
the test item. Additionally, the message "Error! Press screen to continue" will be
displayed at the bottom of the screen.
If the power to the operator terminal or the PC was interrupted while download-
ing, Firmware checksum or Application checksum will not pass the self-test, in-
dicated by "Failed" in the self-test results after power is restored. If this happens,
the user can simply follow the download procedure to re-download the applica-
tion or data. After downloading again, all items should pass the self-test.
Note:
When using the operator terminal for the first time, remember to reset the real
time clock (RTC).
ABB, 1SBC159102M0202
15

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CP420B and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

1sbp260182r1001

Table of Contents