For a more detailed description of the commissioning process,
!
refer to the Command Centre installation and user instructions
13.1 Install the filter cartridge
• Unpack filter cartridge, remove sanitary cap.
• Write today's date where shown on the label.
• Avoid touching the filter o-rings and
filter opening as this may cause bacterial
contamination of the cartridge.
• Moisten the o-rings with water.
• Open the filter door on the Command Centre.
• Align the front cartridge label to the left, and
push the new cartridge up into the filter head.
• Turn the cartridge a quarter turn anticlockwise
until it comes to a complete stop and locks,
with the front label facing forward.
13.2 Turn on the supplies & familiarise yourself with the system
• Connect the mains electrical power cable to the supply.
• Turn the power and water on and check for any leaks.
• Familiarise yourself with the operation of the tap and GUI screen in
preparation for use, see the user guide.
13.3 Select the language, date / time & drain away options
• Initial commissioning screen touch
Language option.
• Touch the appropriate button to select
the language and units of choice.
• Touch the back arrow to go back to
previous menu.
• In the previous menu, touch the arrow to
begin the commissioning process.
Quick Start Installation Guide
22
807042NZ v1.02 08.22 HydroTap G5 UltraCare Install Instructions

SECTION 13: Commissioning

COMMISSIONING
HydroTap G5
Rev
024-H5v0.1.16
Mod
BCS100
S/N
0000000000000
P/N
H50063000AU
LANGUAGE
English
Units :
Metric
12:12 PM
Language
10:50
Imperial