Chapter 2
System Installation
Select the wire gauge for the application. See
Step 1
Locate the load-and-return connections at the rear of the 1 RU Distribution Shelf
Step 2
Remove the Phoenix Contact PC6™ connectors from the 1 RU Distribution Shelf by loosening the flat
Step 3
screws and pulling the connectors away from the 1 RU Distribution Shelf
Figure 2-25
Connect the wires to the appropriate terminal for the load-and-return connections by inserting and then
Step 4
tightening the connector (Phoenix Contact PC6™ connectors)
service loop to allow for the removal of the 1 RU Distribution Shelf.
Reinstall the Phoenix Contact PC6™ connector to the 1 RU Distribution Shelf
Step 5
Reconnect to the 1RU Distribution Shelf
Step 6
Connect the load-and-return cables to the equipment that requires the supplied DC Power per that
Step 7
equipment's specifications.
May 2006
Installing Load Connections
(Figure 2-25
2.5.2 Install 1 RU Distribution Shelf Load Connections
Table 2-7 on page 2-24
for wiring information.
A2
A1
B1
B2
Return
Load
(Figure 2-25
#4).
Cisco AC/DC Power System User Guide, R1.0
(Figure
2-25).
(Figure 2-25
#1).
#2, #3). Allow enough of a
(Figure 2-25
#3).
2-27

Advertisement

Table of Contents
loading

This manual is also suitable for:

124778159330

Table of Contents