Bottom Cover / Fret - Valor RetroFire RF24JDN Installation Manual

Direct vent gas
Table of Contents

Advertisement

Installation
Install Bottom Cover or Cast Iron Fret
Bottom Cover Installation
IMPORTANT
When the bottom cover is used instead of a fret, a
space is required in front of the barrier screen to
allow the window to move and relieve during a
hard start. It is therefore very important to ensure
that an area of 3/4 inch (19 mm) in front of the
barrier screen is kept clear at all times.
Slide the top flange of the bottom cover into slots
located at the bottom corners of the window frame.
Side View
Rear View
Top
Bottom
IMPORTANT
The fret retainer brackets are designed to maintain
a space in front of the screen to allow the window
to move and relieve during a hard start. It is very
important to ensure this area in front of the barrier
screen is kept clear at all times.
DO NOT use
Top flange
this hole
Top
Front
Rear
Bottom
(end plates longer
Bottom flange
than front plate
at bottom)
(bends here)

Bottom Cover / Fret

Fret Installation
Fret Brackets RF24FK Installation
1. Screw 2 thumbscrews into each retainer tab.
2. Fit the retainer tabs to each leg (1 screw per side).
3. Fit the slotted holes in the fret brackets over the
thumbscrews, push the fret brackets downwards
and tighten the screws.
Fit thumscrews
to retainer tab
Fit retainer tab
to leg
Slip fret brackets
over thumbscrews
and tighten screws
Cast Iron Fret Installation
1. Adjust the screw heads on the back of the fret to the
thickness of the fret brackets.
2. Drop the fret into place while guiding the screw
heads into the slots in the brackets.
3. Clip the ash pan cover onto the fret.
Drop fret with
bolt into slotted
bracket (fret
adjusts up or
down to suit)
37

Advertisement

Table of Contents
loading

Table of Contents