Cisco 7500 Series Configuration Manual page 134

Cisco systems bridge/router installation and configuration guide
Hide thumbs Also See for 7500 Series:
Table of Contents

Advertisement

Installing the Cisco 7513, Cisco 7513-MX, and Cisco 7576
R E V I E W D R A F T — C I S C O C O N F I D E N T I A L
Figure 3-12
(Use Cisco 7513 and Cisco 7576
(Use Cisco 7513 and Cisco 7576
Rack-Mount Kit Installation Instructions )
Perform an intial configuration and
create a basic configuration file. Use the
procedures in Chapter 4 "Performing
a Basic Configuration of the System."
For more information about configuration,
refer to the Cisco IOS configuration
guides and command reference.
Depending on your configuration, you might need to remove processor modules to reduce the weight of
the chassis for rack-mount installation. To remove or insert interface processors, you do not need to turn
off power to the system; however, on single power supply systems, you must turn off the system power
before you insert or remove an RSP.
Place removed processor modules in the collapsible, black-cardboard board racks that were provided
Note
with your packing material. (See
You need a number 1 Phillips or 3/16-inch flat-blade screwdriver to remove any fillers (blank processor
module carriers) and to tighten the captive installation screws that secure the processor module in its slot.
Whenever you handle modules, you should use an ESD-preventive wrist strap or other grounding device
to prevent ESD damage.
Cisco 7500 Series Installation and Configuration Guide
3-20
Installation Flowchart (Cisco 7513, Cisco 7513-MX, and Cisco 7576)
Unpack the router
Unpacking Instructions )
Rack-mount the router
(optional)
Insert power supplies
Make all external connections
Figure
3-13.)
Chapter 3
Installing a Cisco 7500 Series Router
OL-5008-03 B0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

750775137505

Table of Contents