Download Print this page

Cisco 7513 Quick Start Manual page 5

Cisco systems router quick start guide

Advertisement

Install the Hardware
Install the Router on a Bench or Tabletop
Note
To rack-mount the router, refer to the
"Rack-Mount the Router (Recommended)" section
on page 4.
Caution
Two people are required to
perform this step. Avoid sudden twists or
moves to prevent injury.
Step 1
With a person positioned at either side of
the chassis, grasp the bottom edge of the
chassis with one hand near the front and
the other near the back. Slowly lift the
chassis in unison. Place the chassis on a
bench or tabletop where the air intake
vent on the front of the chassis is not
drawing in exhaust air from other
equipment.
POWER
A
POWER
B
Warning
lift by grasping the handle of the blower
module, nor should you grasp the air intake
grill.
Step 2
Ensure that you have at least 2 or 3 feet
(0.6 to .09 m) of clearance around the rear
of the chassis to install power supplies and
perform maintenance on the chassis.
Step 3
Proceed to the "Install Interface
Processors, Fillers, VIPs, or RSPs" section
on page 9.
When lifting the router, do not
3

Advertisement

loading

This manual is also suitable for:

7576