Mount The Switch; Rack Or Cabinet Mounting - HP ProCurve 4202vl-48G Installation And Getting Started Manual

Procurve 4200vl series
Hide thumbs Also See for ProCurve 4202vl-48G:
Table of Contents

Advertisement

Installing the Switch 4200vl Series
Installation Procedures

5. Mount the Switch

After the modules and optional power supply are installed and you have
verified the switch passes self test, you are ready to mount the switch in a
stable location. The Switch 4200vl Series can be mounted in these ways:

Rack or Cabinet Mounting

The Switch 4200vl Series are designed to be mounted in any EIA-standard 19-
inch telco rack or in an equipment cabinet such as a server cabinet. If you are
installing the switch in an equipment cabinet, please see the "Equipment
Cabinet Note" on
C a u t i o n
For safe operation, please read the "Installation Precautions" on
before mounting the switch.
1.
2-14
in a rack or cabinet
on a horizontal surface
on a wall
page
2-17.
Use a #1 Phillips (cross-head) screwdriver and attach the mounting
brackets to the switch with the included 10-mm M4 screws.
For the Switch 4204vl, 4202vl-48G, and 4202vl-72, each bracket is attached
with two screws, and for the Switch 4208vl and its bundles each bracket
is attached with three screws as shown in the illustrations on the next
page.
page 2-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents