Installation Procedures; Summary - HP ProCurve 1400-8G Installation And Getting Started Manual

Hp procurve 1400-8g: install guide
Hide thumbs Also See for ProCurve 1400-8G:
Table of Contents

Advertisement

Installation Procedures

Summary

Follow these easy steps to install your switch. The rest of this chapter
provides details on these steps.
1.
Prepare the installation site. Make sure of the following:
the network cabling is the correct type and length. See page
2-5.
See page 2-4 for installation precautions.
2.
Verify the switch passes self test. This is a simple process of
plugging the switch into a power source and observing that the
LEDs on the switch's front panel show correct operation. See
page 2-7.
3.
Mount the switch. The switch can be mounted on any horizontal
surface.
4.
Connect power to the switch. Once the switch is mounted, plug
in the AC power adapter. See page 2-8.
5.
Connect the network devices. Using the appropriate network
cables, connect computers, servers, printers and other periph-
erals, and other network devices including other switches, hubs,
or routers to the switch ports. See page 2-9.
At this point, the switch is fully installed and your network should be
up and running. See the rest of this chapter if you need more detailed
information on any of these installation steps.
Installing the Switch
Installation Procedures
2-3

Advertisement

Table of Contents
loading

Table of Contents