Thermador VTR2FZ Installation Instructions Manual page 6

Ventilation blower motor
Table of Contents

Advertisement

Available languages

Available languages

Step 3: INSTALLATION
1. Hold the blower on the wall.
Note the direction of the air flow.
2. Mark the four (x 4) mounting holes.
At least one screw must be installed through a
stud.
All hardware must be suitable for the wall's
construction materials.
Ensure the air outlet points downward.
3. Wall break:
Mark and drill a guide hole and a separate hole for
electrical conduit.
4. Drill the 4 x ¼'' (6,3 mm) Ø mounting holes.
Insert wall anchors where necessary and screw the
blower to the wall.
5. Connect the ducting from the blower to the extractor
hood and feed to the outside.
min. 40"
min. 40"
min. 40"
(101.5 cm)
(101.5 cm)
(101.5 cm)
min. Ø 10½"
min. Ø 10½"
min. Ø 10½"
(267 mm)
(267 mm)
(267 mm)
(394 mm)
(394 mm)
(394 mm)
7 7
"
"
"
3
3
3
/
/
/
16
16
16
(183 mm)
(183 mm)
(183 mm)
"
"
"
6 6
5
5
5
/
/
/
16
16
16
(160 mm)
(160 mm)
(160 mm)
"
"
"
13
13
13
/
/
/
16
16
16
(21 mm)
(21 mm)
(21 mm)
6 6
"
"
"
1
1
1
/
/
/
4
4
4
(159 mm)
(159 mm)
(159 mm)
¾"
¾"
¾"
(19 mm)
(19 mm)
(19 mm)
15½"
15½"
15½"
21¼"
21¼"
21¼"
(540 mm)
(540 mm)
(540 mm)
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vtr1fz

Table of Contents