Download Print this page

Daikin RKN18NMVJU Service Manual page 20

18000 btu/h class
Hide thumbs Also See for RKN18NMVJU:

Advertisement

Electronic Expansion Valve Coil / Compressor
Step
2
Remove the terminal
cover.
3
Remove the protection
bushing.
4
Disconnect the
compressor lead wires
and the overload
protector.
5
Heat up the brazed part
of the discharge side
pipe and disconnect it.
6
Heat up the brazed part
of the suction side pipe
and disconnect it.
7
Remove the 3 nuts.
8
Lift up the compressor
and remove it.
18
Procedure
Overload protector Protection bushing U (red)
V (yellow)
Brazed part of the
Brazed part of the
discharge side pipe
suction side pipe
Nut
Terminal cover
(R21915)
W (blue)
(R21916)
(R21917)
Si001556E
Points
Removal Procedure

Advertisement

loading