Download Print this page

DEVA DLT TSM106 Installation And Maintenance

Advertisement

Quick Links

DLT TSM106
Guarantee
INSTALLATION AND MAINTENANCE
Your product comes with a 5 year guarantee; this includes
2 years parts and labour, with the following 3 years parts only, proof of
purchase will be required.
This guarantee is invalid if the product is misused, incorrectly installed,
maintained or cleaned.
Installation
Installations should be carried out by a competent installer, who must
after completion, check for leaks, from both the product and pipe work.
All installations must be carried out in compliance with Water Bye Law
Regulations, for further details contact your Local Water Authority.
The product must be installed and used in such a way as not to cause
water damage, therefore water from the product must be suitably
directed and/or retained.
Cleaning
This product should be maintained using a clean damp cloth, do not use
abrasive agents or materials on the product surface.
For technical, installation, servicing advice and/or spare parts please
call:
CUSTOMER CARE LINE
0800 1951602
Deva reserves the right to change or improve the products described in any of its
publications
Please retain this document for future use and
reference.
DTC INST 145 issue 2 – 16.11.07

Advertisement

loading
Need help?

Need help?

Do you have a question about the DLT TSM106 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for DEVA DLT TSM106

  • Page 1 For technical, installation, servicing advice and/or spare parts please call: CUSTOMER CARE LINE 0800 1951602 Deva reserves the right to change or improve the products described in any of its publications Please retain this document for future use and reference.
  • Page 2: Temperature Adjustment

    Temperature Adjustment Operating Conditions of Use This should be carried out by a competent person and only when absolutely Prior to installation the operating conditions of use must be checked. The table necessary. shown (Table 1) contains details of the necessary conditions of operation. Turn the handle anti-clockwise to fully hot.
  • Page 3: Commissioning And Testing

    Commissioning and Testing Operating Conditions of Use (CONTINUED) It is a requirement that all TMV2 approved valves shall be verified The mixer is designed to allow a maximum pre-set temperature of 46° c in line with the TMV2 approval. against the original set temperature results once a year. When commissioning/testing is due the following performance checks shall The mixer works within the parameters set out within the requirements of TMV2 be carried out.
  • Page 4 Valve Installation Criteria Mixer Installation The mixer must be installed in accordance with the following installation Before installation flush the system thoroughly to remove any debris as this guide. will affect the performance of the product. The mixer has been supplied with filters which must be fitted, see section Once flushed turn off the water supply either at the stopcock or at the “Product Installation”...
  • Page 5: Product Operation

    Product Operation Installation of Check Valves and Restrictors To operate the mixer in bath mode ensure that diverter is in the up position, then open both handles to allow water flow into the bath from the spout, to Before installation you must determine whether or not the flow restrictors control the temperature only turn the central temperature control, to control supplied are required.