Preparation; Two Wheel Kit Installation - Yamaha EF7200DE Owner's Manual

Hide thumbs Also See for EF7200DE:
Table of Contents

Advertisement

1
2
3
4
5
6
7

PREPARATION

1

Two wheel kit installation

1. Fasten the engine hanger to the carrier frame with
the bolts.
TIP
Match the punch marks as shown in the illustration.
000-000
1 Bolt (8 × 16 mm Flange bolt)
2 Engine hanger
3 Carrier frame
Tightening torque:
16 N·m (1.6 kgf·m, 12 lb·ft)
000-000
2. Install the damper and plate into the stopper, and
tightly fasten it to carrier frame with the bolt.
4 Damper
5 Plate
6 Stopper
7 Bolt (6 × 16 mm Flange bolt)
000-000
Tightening torque:
7 N·m (0.7 kgf·m, 5.2 lb·ft)
000-000
– 13 –

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ef7200d

Table of Contents