SRS-GD50iP
•
This set can be disassembled in the order shown below.
2-1.
DISASSEMBLY FLOW
SET
2-2. MAIN BOARD (CONTROL BOX)
(Page 4)
2-3. LED BOARD (CONTROL BOX)
(Page 5)
2-4. DOCK BOARD (CONTROL BOX)
(Page 6)
Note: Follow the disassembly procedure in the numerical order given.
2-2.
MAIN BOARD (CONTROL BOX)
Note 1: This illustration sees the set from bottom side.
2 two screws
(P2
4 two screws
(P2.6
6)
5 rear cover
Note 2:
Inserts until matching
rear cover to jack and
bumping.
6 wire (flat type) (40 core)
(CN505)
4
SECTION 2
DISASSEMBLY
5)
8 MAIN board
3 bottom cover
7 wire (flat type)
(15 core)
(CN100)
1 four screws
(BVTP3
8)
Note 3:
Note 4:
MAIN board block is lowered while
putting the headphone jack in the hole
of top cover assy.
MAIN board must gotten
on the stepped section.
Need help?
Do you have a question about the SRS-GD50iP and is the answer not in the manual?
Questions and answers