Start-Up

DANGER
Electric shock hazard. Can cause injury or death.
Before attempting to perform any service or
maintenance, turn the electrical power to unit
to OFF at disconnect switch(es). Unit may have
multiple power supplies.
WARNING
Use caution when removing access panels or other
unit components, especially while standing on a
ladder or other potentially unsteady base. Access
panels and unit components can be heavy and
serious injury may occur.
Do not operate energy recovery ventilator without
the filters and birdscreens installed. They prevent
the entry of foreign objects such as leaves, birds,
etc.
CAUTION
Do not run unit during construction phase. Damage
to internal components may result and void
warranty.

General Start-Up Information

Every installation requires a comprehensive start-
up to ensure proper operation of the unit. As part
of that process, the following checklist must be
completed and information recorded. Starting up
the unit in accordance with this checklist will not
only ensure proper operation, but will also provide
valuable information to personnel performing future
maintenance. Should an issue arise which requires
factory assistance, this completed document
will allow unit experts to provide quicker resolve.
Qualified personnel should perform start-up to ensure
safe and proper practices are followed.
Unit Model Number _______________________________
Unit Serial Number _______________________________
Start-Up Date
_______________________________
Start-Up Personnel Name __________________________
Start-Up Company _______________________________
Phone Number
_______________________________
Pre Start-Up Checklist –
completed.
o Disconnect and lock-out all power switches
o Remove any foreign objects that are located in the
energy recovery unit.
o Check all fasteners, set-screws, and locking collars
on the fans, bearings, drives, motor bases and
accessories for tightness.
18
Model PVe Heat Recovery Unit
(e.g. PVe-20)
(e.g. 10111000)
check as items are
o Rotate the fan wheels by hand and ensure no parts
are rubbing. If rubbing occurs, refer to Start-Up
section for more information.
o Check the fan belt drives for proper alignment
and tension (refer to Start-Up section for more
information).
o Filters can load up with dirt during building
construction. Replace any dirty pleated filters and
clean the aluminum mesh filters in the intake hood
(refer to Routine Maintenance section).
o Verify that non-motorized dampers open and close
properly.
o Check the tightness of all factory wiring
connections.
o Verify control wire gauge (refer to the Electrical
Connections section).
o Install exhaust inlet motorized damper (see Unit
Accessories section)

SPECIAL TOOLS REQUIRED

• Voltage Meter (with wire probes)
• Amperage Meter
• Thermometer
• Tachometer
• Incline manometer or equivalent
Start-Up Checklist
The unit will be in operational mode during start-up.
Use necessary precautions to avoid injury. All data
must be collected while the unit is running. In order to
measure volts & amps, the control center door must
be open, and the unit energized using a crescent
wrench to turn the disconnect handle.
Check line voltage at unit disconnect
_______
L1-L2 volts
_______
L2-L3 volts
_______
L1-L3 volts
Motor Amp Draw
• Supply Fan
_______
L1 amps
_______
L2 amps
_______
L3 amps
Fan RPM
_______
Supply Fan
Correct fan rotation direction
Supply Fan
Exhaust Fan
• Exhaust Fan
______
L1 amps
______
L2 amps
______
L3 amps
______
Exhaust Fan
Yes / No
Yes / No