Nor shall EVAPCO, Inc. be responsible for any loss or damage (direct, indirect, consequential, or other) during installation or handling of equipment after shipment. For a full description of EVAPCO’s liability policy, please visit www.evapco.com to access our Terms and Conditions.
Should the field inspection indicate the section alignment (“square”) has been altered, please contact the factory or your local EVAPCO sales representative for additional instructions to obtain proper section fit.
PHC PARALLEL HYBRID EVAPORATIVE CONDENSERS PHC-S208 to PHC-S1182 PHC-D621 to PHC-D2050 PHC-S-E Models PHC-D-E Models PHC-L463 to PHC-L842 AIR IN AIR IN AIR IN AIR IN AIR IN AIR IN Figure 1 — Recommended Steel Support for S Models Figure 2 — Recommended Steel Support for D Models Table 1 —...
PHC PARALLEL HYBRID EVAPORATIVE CONDENSERS Figure 3 — S Model Basin Section Figure 4 — D Model Basin Section 9’ (2.7 m), 12’ (3.6 m) and 18’ (5.5m) Long 24’ (7.3 m) and 26’ (7.9 m) Long Extended Lifts The recommended method for extended lifts is to use safety slings under the unit (see Figure 5). Spreader bars should always be used between the cables at the top of the section to prevent damage to the upper flanges.
PHC PARALLEL HYBRID EVAPORATIVE CONDENSERS Applying Sealer Tape Once the bottom section has been set on the supporting steel and bolted in place, wipe the top flanges to remove any dirt or moisture. Place sealer tape over the mounting holes centerline on the side flanges. Apply two strips of sealer tape, one partially overlapping the other, on the end flanges.
PHC PARALLEL HYBRID EVAPORATIVE CONDENSERS Figure 9 – Mating Upper Coil / Fan Section to Basin Section NOTE: A rigging box equipped with sealer tape and necessary fasteners is normally secured inside the pan basin for shipping. Remove the rigging box from the basin prior to assembly of sections.
Bleed or Blowdown EVAPCO recommends an automated conductivity controller to maximize the water efficiency of your system. Based on recommendations from the selected water treatment company, the conductivity controller should open and close a motorized ball or solenoid valve to maintain the conductivity of the recirculating water.
Page 9
The initial commissioning and passivation period is critical for maximizing the service life of galvanized equipment. EVAPCO recommends that site-specific water treatment protocols include a passivation procedure which details water chemistry, any necessary chemical addition, and visual inspections during the first six (6) to twelve (12) weeks of operation.
Page 12
PARTS AND SERVICE, CONTACT YOUR LOCAL EVAPCO REPRESENTATIVE OR THE LOCAL SERVICE CENTER EVAPCO, Inc. — World Headquarters & Research/Development Center P.O. Box 1300 • Westminster, MD 21158 USA 410.756.2600 • marketing@evapco.com • evapco.com North America Europe Asia Pacific EVAPCO, Inc.