Making British gardens great
LOG STORE
We recommend using the following tools (NOT SUPPLIED):
Tape Measure
Pozidrive
Screwdriver
It's vital that you build your new log store on a level ground in your
desired location.
IMPORTANT
Assembly requires 2+ adults.
1
Position the floor in your desired location.
3
Apply and screw the roof into the side pieces. Screw through the roof
battens, with one screw into the side piece batten, and the other into the
fascia as shown above. Ensure you push the roof forward from the back.
As a result, the side pieces will be at both back internal corners of the roof.
Missing Something?
Call our aftersales team on
0333 777 7089
Forest Garden, Oak Drive, Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB
INSTRUCTIONS
Drill & 2mm
Spirit Level
Drill Bit
2
Screw the side piece to the base as shown above. Ensure the side piece is flush to the base
edges. When screwing, make sure you screw through the side piece frame into the base
beneath. Repeat the process for the other side.
4
Mark, pre-drill and screw the fascias to the back of the side pieces as
shown above. Use the measurements provided to screw them in the correct
place. Ensure you choose the correct measurements based on the size of
Need more information?
Call our technical team on
0333 321 3142
FIXING PACK CODE: LGSTFP
FIXING PACK CONTAINS:
PLEASE KEEP PLASTIC BAGS AND SMALL
PARTS AWAY FROM CHILDREN
REMINDER
Always pre-drill before screwing.
SMALL LOG
STORE
952.25mm
44mm
your log store.
Visit our website for spare
instructions and more
information
www.forestgarden.co.uk
ISSUE: 0119
LARGE LOG
STORE
596.6mm
596.6mm
44mm