Please record the serial number (located on the control box cover), and the date and place of purchase in the spaces provided below. Refer to this information when calling GTO for service or assistance with your automatic gate operator. Serial Number ____________________ Date of Purchase ____________________ Place of Purchase ____________________ Remember to keep all receipts for proof of purchase.
Because GTO automatic gate operators are only part of a total gate operating system. It is the responsibility of the designer, installer, and purchaser to ensure that the total system is safe for its intended use.
IMPORTANT SAFETY INSTRUCTIONS For The System Designer WARNING: To reduce the risk of injury or death: READ AND FOLLOW ALL INSTRUCTIONS. This operator is intended for use only on vehicular gates. Pedestrians must be supplied with a separate walk- through gate (see Entrapment Protection illustration on page 6). When designing a system that will be entered from a highway or main thoroughfare, make sure the system is placed far enough from the road to prevent traffic congestion.
Page 6
IMPORTANT SAFETY INSTRUCTIONS IMPORTANT SAFETY INSTRUCTIONS for the Installer III. After Installation Review ALL safety instructions with the consumer/end user and explain the basic operation and safety systems of the entire gate operator system, including disconnecting the operator for manual operation of the gate.
ENTRAPMENT ALARM (UL 325; 30A.1.1A) The GTO/PRO 1000 series operators are designed to stop and reverse for 2 seconds when the gate comes in contact with an obstruction or when an object activates the non-contact sensors. Additionally, these operators are equipped with an audio entrapment alarm which will function if the unit obstructs twice while opening or closing.
Page 8
It is your responsibility to make sure that the installer posted warning signs on both sides of your gate. If any of these signs or warning decals become damaged, illegible or missing, replace them immediately. Contact your installer or GTO for replacements. If electric safety edge sensors (or photoelectric sensors) have been installed (see page 6) they should be tested monthly for proper function.
Required Safety Precautions for Gates Install Warning Signs Warning signs alert people of automatic gate operation and are required when installing the GTO/PRO 1000 and series gate operators. Furthermore, a walk-through gate must be installed if pedestrian traffic is expected near the vehicular gate.
Page 10
1. Turn control box power switch OFF. 2. Disconnect front mount from gate bracket. 3. Pull front mount away from gate bracket. Disconnect operator ONLY when the control box power switch is OFF and the gate is NOT moving. GTO, Inc. Tallahassee, Florida USA WARNING RB2000...
• The GTO/PRO 1000 system is powered by a 12 Vdc, 7.0 Ah, sealed, rechargeable battery • Battery charge for GTO/PRO 1000 is maintained by a 120 Vac, 18 Vac (20 VA) transformer rectified to 14.5 Vdc through the GTO Control Board. Two (2) blade-style control board fuses are rated for 15 A.
Parts Identification Single Gate Operator and Hardware Gate Bracket (1) Closed Position Stop Plate (1) 8" Nylon Cable Tie (14) 3/8" x 8" Bolt (4) 3/8" x 3" Bolt (2) 3/8" x 2" Bolt (1) 5/16" x 1-3/4" Bolt (1) 3/8"...
See page 20, Powering the System and the Accessory Catalog. • If your gate is more than 1000' away from an ac power source you will need to use at least one GTO Solar Panel to trickle charge the battery. See the Accessory Catalog.
Installation Overview Pull-to-Open Gates (Gate Opens into the Property) The diagram below is an example of a pull-to-open installation on a chain link fence and single gate. If you are installing a push-to-open gate system, see Push-to-Open Installation starting on page 30. Mounting the operator on a masonry column requires special procedures;...
Page 15
Determining The Mounting Position of The Post Bracket Assembly and The Gate Bracket Step 3: Join the post bracket assembly " using the " x 2 bolt in the center holes as shown. Fasten a " washer and nut on the end of the bolt.
Page 16
Step 6 Study the 4 " x 4 " setback template (see insert) provided with this manual. Once you are familiar with its illustrations, cut and save the template from the insert. The template will determine the correct position of the post pivot bracket before mounting the operator on the fence post.
Installation of Mounting Hardware The post bracket position determines both the leverage and efficiency of the operator, and the clearance between the operator and the gate in the open and closed positions. The post bracket is designed with a curvature that works well with installations on both round and square fence posts. Since the post bracket carries the entire back thrust of the active operator, it is absolutely necessary that it be mounted with bolts that completely penetrate the fence post.
Page 18
Installing The Post Bracket Assembly and Gate Bracket Step 7: Mark the holes in the middle of the bracket slots so there will be some room for adjustment when mounting the post bracket assembly and the gate bracket on the fence post and gate cross member. Then remove the operator and brackets from the fence and gate.
Moreover, a stable gate helps to maintain the long life of your automatic gate opener system. To further enhance the stability and security of your gate, install the optional GTO Automatic Gate Lock (see Accessory Catalog).
Page 20
At this stage of the installation, the operator should be installed on the gate and the open and closed position stops should be in place. Check List • The gate is plumb, level, and swings smoothly on its hinges. • After measuring with the 4 "...
Mounting the Control Box Step 14 Mount the control box using the nylon cable ties (provided) or another secure mounting method. The control box must be mounted at least 3 feet above the ground to protect it from rain splash, snow, etc., and at least 3 feet from an ac power source to prevent electrical interference.
Step 17: Carefully insert the power cable plug into the coupling at the rear of the operator. Turn the plug until it aligns with the pins in the coupling. Push the plug into the coupling until it stops. Finger tighten the sleeve nut to lock the plug in position. Replace the control box cover and fasten it with (4) screws.
Powering The System IMPORTANT: • The GTO transformer is intended for indoor use. If the transformer can only be plugged into an outside electrical outlet, a weatherproof housing or cover (available at local electrical supply stores) must be used. • All low voltage wire for powering the GTO/PRO must be 16 gauge dual conductor, multi-stranded, direct burial wire (see Accessory Catalog).
Page 24
IMPORTANT INFORMATION ABOUT LOW VOLTAGE WIRE The only wire acceptable for use with GTO products is 16 gauge multi-stranded, low voltage, PVC sheathed wire. This particular gauge enables the transformer to provide an adequate charge through the control board to the battery at distances up to 1000 ft.
Page 25
Spade Tongue Terminal (not provided) Black Step 27: Plug in the transformer. We strongly recommend using a surge protector. Step 26: Strip " off the ends of the low voltage wire and attach ends to the transformer terminals; red lead to (RED), black lead to (BLK).
The four DIP switches on the control board match the operator with the type of gate on which it is mounted. For example, gates may pull-to-open or push-to-open. Prior to packaging, the GTO/PRO 1000 control board was configured for single swing gates that pull-to-open (open into the property). If your gate type matches this configuration, you DO NOT need to adjust the DIP switches;...
All three potentiometers were set to minimum at the factory. The OBSTRUCT SENS. potentiometer MUST be adjusted above the factory setting for your GTO/PRO 1000 series operator to function properly. If the potentiometer is left at MIN, your gate operator may "obstruct"...
Setting Your Personal Transmitter Code All GTO transmitters are set to a standard code at the factory and are ready to activate your automatic gate operator. For your safety and security, however, we strongly recommend that you replace the factory setting with your own personal code.
Consider the following when mounting the receiver: • Receiver cable length is 10 feet (receivers with a longer cable are available as special order items; call the GTO Sales Department). NEVER splice receiver cable! • Run the cable through PVC conduit to protect it from damage.
Connecting Additional Safety Devices The GTO/PRO 1000 series operators are equipped with built-in obstruction sensitivity. The operator is designed to stop and reverse the gate for 2 seconds when it comes in contact with an obstruction. However, obstruction sensitivity, even when properly adjusted, may not be sensitive enough to prevent bodily injury in some circumstances.
Although GTO strongly recommends the use of safety devices, we do not endorse any specific brand names. Below is a list of some products compatable with GTO operators systems, some of which require their own power supply. Check with the individual manufacturer for specific power needs.
Connecting Accessories Make sure the control box power switch is OFF before connecting accessories. The ACCESSORY terminal block is the connection point for accessories such as push buttons, safety loops, intercoms, etc. The ACCESSORY terminal marked GRN (green) is the common ground for all accessories. GRN is paired with the terminals shown below when connecting accessories to the control board.
Push to Open Installation Determining The Mounting Position of The Post Bracket Assembly Swinging gates shall not open into public access areas! A "Push-to-Open" gate opens out from the property. A Push-to-Open Kit is required for this type of installation (see Accessory Catalog).
Page 34
Step PTO-3: With the gate in the fully closed position and the operator retracted, swing the operator to the gate. Mark reference points for bolt holes on gate cross member through middle of gate bracket slots. The operator must be level. (Some vertical adjustment is possible by sliding the post bracket assembly up and down.) Drill member as marked.
Maintenance and Troubleshooting Guide If your gate operator does not function properly after it is installed, use this guide before calling the GTO Service Department. • On all gates weighing 250 lb. or more, routinely grease the ball bearing hinges at least 4 times a year; more frequently if the gates are near a coastal area.
Page 36
12 V Battery ____________________________ 12.0 to 13.5 Vdc 7.0 Ah Charging circuit _________________________ 12.0 to 14.8 Vdc measure voltage with battery connected The GTO, Inc. Technical Service Department is open Monday – Thursday 7:30 and Friday 8:00 Telephone (800) 543-1236 Telephone (850) 575-4144 Fax (850) 575-8950 •...
2. Call your dealer or installer for assistance. 3. If your dealer or installer is unable to resolve the problem, call the GTO Service Department at (850) 575-4144 to discuss the problem with a service technician. Refer to the serial number (located on the control box cover) and date of purchase when calling for assistance.
Column Installation Information READ THE FOLLOWING CAREFULLY BEFORE INSTALLING THE GTO/PRO 1000 AND GTO/PRO 1200 ON GATES THAT ARE MOUNTED ON COLUMNS MADE OF MASONRY, BRICK, ROCK, etc. Attaching a gate operator to a gate mounted on a masonry column requires special procedures.
GTO/PRO Dual Gate System Installation Second Unit Parts List Post Pivot Bracket (1) Gate Bracket (1) Closed Position Stop Plate (1) 8" Nylon Cable Tie (6) 3/8" x 8" Bolt (4) 3/8" x 3" Bolt (2) 3/8" x 2" Bolt (1) 5/16"...
Installing the Second Unit The diagram below is of a dual gate, pull-to-open (open-in) installation on a chain link fence and gates. "Pull-to-Open" dual gates open into the driveway. If you are installing a "Push-to-Open" gate system see "Push- to-Open Installation" starting on page 30. Receiver Control Box with Battery 120 Volt Indoor...
Page 41
Step D-5: Attach the closed position stop plate vertically to the inside bottom of the gate that will close first. When the gate is in closed position, the positive stop plate should rest against the ground stop installed in Step D-4. Connecting the Second Operator to the Control Board Step D-6: Turn power switch OFF.
Step D-9: Cut slot into driveway and lay PVC conduit in this slot. Pull the 25 foot power cable for the second operator through the conduit (see Illustration B on page 37). Step D-10: Carefully insert the power cable plug into the coupling at the bottom of the operator housing. Turn the plug until it aligns with the pins in the operator coupling.
Page 43
Step D-13 BOTH OPERATORS OPEN SIMULTANEOUSLY BOTH OPERATORS CLOSE SIMULTANEOUSLY SEQ1 = ON SEQ2 = OFF If SEQ1 is set to ON, and SEQ2 is set to OFF, the FIRST OPERATOR and SECOND OPERATOR open and close simultaneously. FIRST OPERATOR OPENS FIRST, SECOND OPERATOR CLOSES FIRST SEQ1 = OFF SEQ2 = ON...
® AUTOMATIC GATE OPERATORS Accessories from GTO, Inc. Available through your dealer.
Page 45
Receiver). Battery included. GTO Digital Keypad (F300) The weatherproof digital keypad can be easily installed as a wired or wireless keypad for all GTO swing and slide gate operators, and as a wired keypad for the Bulldog Pedestrian Gate Lock. It can be programmed to recognize fifteen different personal identification number (PIN) codes.
Page 46
Standard Replacement Power Cables for Gate Operators The PRO 4.5C (AW201): 4.5 ft. power cable included with GTO/PRO 1000 gate operators with serial numbers. The PRO 25C (AW202): 25 ft. power cable included with GTO/PRO 1000/1200 gate operators with serial numbers.
Page 47
Particularly suited for remote installations, the solar panel comes with tubular steel support, mounting clips, wire connectors, and 8 ft. of low voltage wire (see Low Voltage Wire for longer wire). All GTO low volatge operators are pre-wired for solar panels. Installation in some regions of the world will require multiple panels for adequate charging power.
___ Customer was instructed about proper use of transmitter and (or) other entry controls. ___ Customer was asked to fill out customer support card and mail it to GTO, Inc. ___ Customer was asked to retain all receipts (receipts provide proof of warranty).
Need help?
Do you have a question about the SL-5100 and is the answer not in the manual?
Questions and answers