Download Print this page

Craftsman 247.24019 Operator's Manual page 13

Two bin gagger
Hide thumbs Also See for 247.24019:

Advertisement

Available languages

Available languages

12.
Install the grass-catcher pin (911-04069) from hardware pack 689-
00092A into the hole provided in the upper portion of the chute elbow
and secure with a flange lock nut (712-04064). See Fig. 22.
13.
Install rubber strap (723-04008A) onto the chute tube extension using
clevis pin (711-05063), flat washer (736-0204) and bow-tie cotter pin
(710-04040) from hardware pack 689-00092A. Attach the end with
the hole closest to the end of the strap, as seen in Fig. 23. This will
make it easier to grab onto the strap to pull, stretch and hook onto the
grass-catcher pin installed on the chute elbow in the previous step.
14.
With the tractor's discharge chute raised up and held open, install
the chute elbow over the chute opening by placing the deck
mounting pin in the hole provided, as seen in Fig. 24, then secure
the elbow to the deck by hooking the retainer strap hook over the
deck wheel mounting bracket as seen in Fig. 25.
On decks without deck wheels, hook the retainer strap
Note:
into the hole provided in the flange on the front-side of the cutting
deck.
ASSEMBLY AnD InSTALLATIOn
Figure 22
Figure 23
13
Figure 24
Figure 25

Hide quick links:

Advertisement

loading