Download Print this page

Advertisement

Quick Links

Light My Bricks: Ninjago City Lighting Kit
The following page is instructions for the Light My Bricks LEGO Ninjago City (70620)
LED light kit. You purchase this kit on our
of cial website.
To ensure a trouble-free installation of your light kit, please read and follow each step
carefully.
If you run into any issues, please refer to the
online troubleshooting
guide.
This user guide is also available to download in
PDF format here.

Advertisement

loading
Need help?

Need help?

Do you have a question about the LEGO Ninjago City 70620 Lighting Kit and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for LIGHT MY BRICKS LEGO Ninjago City 70620 Lighting Kit

  • Page 1 Light My Bricks: Ninjago City Lighting Kit The following page is instructions for the Light My Bricks LEGO Ninjago City (70620) LED light kit. You purchase this kit on our of cial website. To ensure a trouble-free installation of your light kit, please read and follow each step carefully.
  • Page 2 Package contents: 11x White Strip Lights 2x Blue Strip Lights 3x White 30cm Bit Lights 13x White 15cm Bit Lights 3x Flashing White 30cm Bit Lights 4x Pink 30cm Bit Lights 2x 12-Port Expansion Board 2x 6-Port Expansion Boards 3x 30cm Connecting Cables 11x 15cm Connecting Cables 2x 5cm Connecting Cables 8x Adhesive Squares...
  • Page 3 Cables can t in between and underneath LEGO® bricks, plates, and tiles providing they are laid correctly between the LEGO® studs. Do NOT forcefully join LEGO® together around cables; instead ensure they are laying comfortably in between each stud. ...
  • Page 4 “ CAUTION: Forcing LEGO® to connect over a cable can result in damaging the cable and light. Connecting cable connectors to Expansion Boards Take extra care when inserting connectors to ports of Expansion Boards. Connectors can be inserted only one way. With the expansion board facing up, look for the soldered “=”...
  • Page 5 ...
  • Page 6 “ Incorrectly inserting the connector can can result in bent pins inside the port or possible overheating of the expansion board when connected. Connecting cable connectors to Strip Lights Take extra care when inserting connectors to ports on the Strip Lights. Connectors can be inserted only one way.
  • Page 7 Installing Bit Lights under LEGO® bricks and plates. ...
  • Page 8 When installing Bit Lights under LEGO® pieces, ensure they are placed the correct way up (Yellow LED component exposed). You can either place them directly on top of LEGO® studs or in between. ...
  • Page 9 OK, Let’s Begin! Instructions for this Kit ...
  • Page 10 1.) Start by removing the roof, third, and fourth oors. ...
  • Page 11 ...
  • Page 12 ...
  • Page 13 2.) We will rst install blue lights under the bridge. ...
  • Page 14 Take the AA Battery Pack (or USB Cable) and insert 3x AA batteries into it. Take 1x Blue Strip Light, 1x LEGO 1×6 Plate and 1x 15cm Connecting Cable.   ...
  • Page 15 Stick the Blue Strip Light to the base of the LEGO plate using it’s adhesive backing. Then connect the 15cm Connecting Cable to one end of the strip light and then connect the Battery Pack /USB cable to the other end. ...
  • Page 16 ...
  • Page 17 ...
  • Page 18 ...
  • Page 19 Mount the strip light underneath the bridge in the following position. Ensure the Battery pack /usb  cable is facing toward the left end of the building before laying it neatly against the back. ...
  • Page 20 ...
  • Page 21 Hide the battery pack/usb cable underneath the Lego pieces as shown below. ...
  • Page 22 ...
  • Page 23 ...
  • Page 24 ...
  • Page 25 Turn on the battery pack to test the lights are working If you’re using the USB Power Cable, connect this to a USB Power Bank or wall adaptor (sold separately) and turn it ON to test the front lights are working OK. ...
  • Page 26 3.) Pull the other end of the 15cm Connecting Cable out to ensure that it is not dangling down and visible from under the bridge. ...
  • Page 27 ...
  • Page 28 4.) Remove the second oor section and then disconnect the three lantern pieces from the bottom. ...
  • Page 29 ...
  • Page 30 Disconnect the black and gold pieces from the top of the lanterns and then take out 3x White 15cm Bit Lights. ...
  • Page 31 Install the rst White 15cm Bit Light by inserting the led component inside the lantern piece. Take the black and gold pieces and then reconnect them over the top. Ensure the led component is facing the front (of where you will be positioning the lantern) and that the cable is pulled to the back of the lantern.
  • Page 32 ...
  • Page 33 ...
  • Page 34 ...
  • Page 35 Repeat this process to install Bit Lights to all three lanterns. ...
  • Page 36 5.) Reconnect the lantern pieces to the bottom of the second oor section ensuring the cables are facing behind each lantern. ...
  • Page 37 ...
  • Page 38 Disconnect the brown plates from underneath and then lay the lantern cables underneath before reconnecting the plates. Ensure the cables are laid in between studs. ...
  • Page 39 ...
  • Page 40 ...
  • Page 41 ...
  • Page 42 6.) Take a 6-Port Expansion Board and then connect the Bit Lights from the lanterns to spare ports. ...
  • Page 43 ...
  • Page 44 7.) Take a 15cm Connecting Cable and connect one end to a spare port then mount the expansion board underneath the second oor using 2x Adhesive Squares. ...
  • Page 45 ...
  • Page 46 Secure the Bit Light Cables neatly and push them up against the base to prevent them from dangling down and being visible. ...
  • Page 47 8.) Locate the other end of the connecting cable from under the bridge and then connect this to the 6-port expansion board then securely reconnect the second oor on top ensuring the other end of the second 15cm connecting cable is pulled out. ...
  • Page 48 ...
  • Page 49 Turn on the battery pack to test the lights we have installed so far. ...
  • Page 50 ...
  • Page 51 9.) Take the entire third oor and then disconnect the four lanterns above the crab restaurant. ...
  • Page 52 ...
  • Page 53 ...
  • Page 54 10.) Take 4x White 15cm Bit Lights and install one to each lantern following the same method used to install lights to the lanterns above the rst oor. ...
  • Page 55 ...
  • Page 56 ...
  • Page 57 11.) Reconnect each lantern back to the top of the restaurant ensuring each cable is pulled up behind the grey bars. ...
  • Page 58 ...
  • Page 59 ...
  • Page 60 Lay each Bit Light Cable underneath the brown tiles on the top of this section ...
  • Page 61 ...
  • Page 62 ...
  • Page 63 12.) We will now install lights above the window features of the restaurant. First disconnect the following pieces ...
  • Page 64 ...
  • Page 65 Lift the bricks above and then carefully disconnect the brown 2×2 plate above the window feature section. ...
  • Page 66 ...
  • Page 67 Take a White 15cm Bit Light and then place the LED Component in the centre of the 4 studs. Ensure the Bit Light is facing down and cable is facing the inside of the restaurant. ...
  • Page 68 ...
  • Page 69 Secure the Bit Light in place by reconnecting the brown 2×2 plate over the top followed by the surrounding pieces we removed earlier. ...
  • Page 70 ...
  • Page 71 ...
  • Page 72 13.) Install another White 15cm Bit Light to the window feature on the other side of the restaurant following the same method used in previous step. ...
  • Page 73 ...
  • Page 74 ...
  • Page 75 ...
  • Page 76 ...
  • Page 77 14.) Before reconnecting the corner bricks and tiles, we will install a light above the ATM. First disconnect the top section of the ATM and then disconnect the trans black tile. ...
  • Page 78 ...
  • Page 79 ...
  • Page 80 ...
  • Page 81 Take a White 15cm Bit Light and then place it in between the two studs (facing up). Secure the bit light in place by reconnecting the trans black tile over the top. ...
  • Page 82 ...
  • Page 83 Lay the cable to the left side of this section and then carefully reconnect this section back to the ATM. ...
  • Page 84 ...
  • Page 85 Lay the cable in between studs before reconnecting the corner bricks and tiles from the restaurant. ...
  • Page 86 ...
  • Page 87 ...
  • Page 88 ...
  • Page 89 15.) Take a 12-Port Expansion Board and then connect all seven of the bit light cables to it. ...
  • Page 90 ...
  • Page 91 Remove the following LEGO piece. ...
  • Page 92 ...
  • Page 93 Mount the expansion board to the following position inside the restaurant using 2x Adhesive Squares. ...
  • Page 94 ...
  • Page 95 26.) Take a 15cm Connecting Cable and connect one end to a spare port closest to the right side. ...
  • Page 96 27.) Eliminate excess cables by laying them underneath the brown tiles on top of the restaurant. ...
  • Page 97 28.) Take the entire third oor and place it on it’s back and then disconnect the six lantern pieces from underneath. ...
  • Page 98 ...
  • Page 99 Take the three lantern sections from the left side and then take 3x White 15cm Bit Lights and install one to each lantern following the same method used to light up the previous lanterns. ...
  • Page 100 ...
  • Page 101 29.) Reconnect the lanterns back to the left side of the third oor and then hide the cables by disconnecting the plates underneath, laying the cables in between studs, and then reconnecting the plates. ...
  • Page 102 ...
  • Page 103 ...
  • Page 104 ...
  • Page 105 ...
  • Page 106 ...
  • Page 107 30.) Take 3x White 30cm Bit Lights and install one to each of the three lantern sections on the right side. ...
  • Page 108 ...
  • Page 109 Reconnect the lanterns back to the right side of the third oor and then hide the cables by disconnecting the plates underneath, laying the cables in between studs, and then reconnecting the plates. ...
  • Page 110 ...
  • Page 111 ...
  • Page 112 ...
  • Page 113 31.) Take the remaining 12-Port Expansion Board and then connect all the cables from the lanterns to the spare ports (closest ports to the left side). ...
  • Page 114 ...
  • Page 115 ...
  • Page 116 Mount the expansion board underneath the third oor in the following position using 2x Adhesive Squares. ...
  • Page 117 ...
  • Page 118 32.) Neaten up messy cables by grouping them together, twisting them around each other and then tucking them into spaces underneath the third oor. ...
  • Page 119 ...
  • Page 120 ...
  • Page 121 You can also secure dangling cables by laying them underneath LEGO plates. 33.) Take 3x White Strip Lights and stick them to 3x LEGO 1×6 Plates. ...
  • Page 122 ...
  • Page 123 Take a 5cm Connecting Cable and connect it to the end of one strip light (strip light 1) then take a 30cm Connecting Cable and connect it to the other end of the strip light and connect the other end of the 30cm cable to another strip light (Strip light ...
  • Page 124 ...
  • Page 125 Take a 15cm Connecting Cable and connect it the other end of strip light 2 and then connect the other end of the cable to strip light 3. ...
  • Page 126 Take the another 30cm Connecting Cable and connect it to the end of strip light 3. ...
  • Page 127 34.) Connect the other end of the 5cm Connecting Cable to a spare port on the 12- port Expansion board and then mount strip light 1 to the following position underneath the third oor. ...
  • Page 128 ...
  • Page 129 Mount strip light 2 and 3 to the following positions on the right side ensuring the other end of the 30cm connecting cable from strip light 3 is facing right. ...
  • Page 130 ...
  • Page 131 To eliminate excess cable, loop and lay the cables under plates and expansion boards ...
  • Page 132 ...
  • Page 133 35.) Pull the other end of the 30cm Connecting Cable from strip light 3 out the back and then pull it up and bring it over the wall behind the following section below. ...
  • Page 134 ...
  • Page 135 ...
  • Page 136 Secure the cable underneath the following brown tile and then connect it to a spare port on the 12-port expansion board inside the restaurant. ...
  • Page 137 ...
  • Page 138 Use your hand to lift all the cables up from underneath them so they are not dangling down and seen from the outside windows. ...
  • Page 139 ...
  • Page 140 36.) We will now install ashing lights to one of the billboards at the front. First disconnect the following sections to allow us to disconnect the two dark grey plates with trans green pieces. ...
  • Page 141 ...
  • Page 142 ...
  • Page 143 ...
  • Page 144 37.) Disconnect the trans green pieces from the grey plates and then starting with the left plate, take a Flashing White 30cm Bit Light and with the cable facing down, place the led component over the left stud. Secure it in place by reconnecting the trans green piece over it.
  • Page 145 ...
  • Page 146 ...
  • Page 147 ...
  • Page 148 Repeat this step to install another Flashing White 30cm Bit Light to the right side. ...
  • Page 149 38.) Reconnect both plates to the sign poles and then thread both cables behind and then down through in between the grey bar and base plate. ...
  • Page 150 ...
  • Page 151 ...
  • Page 152 ...
  • Page 153 Reconnect the sign ...
  • Page 154 39.) Pull both cables down underneath and then connect them to the spare ports on the 12-port expansion board. ...
  • Page 155 ...
  • Page 156 Lay both cables underneath the 2 plates underneath as shown below. ...
  • Page 157 ...
  • Page 158 Group the remaining excess cables together, twist them around each other and then tuck them into the space underneath. ...
  • Page 159 ...
  • Page 160 ...
  • Page 161 40.) Bring the entire third oor above the building and then locate the other end of the 15cm Connecting Cable from underneath. Connect this cable into a spare port on the 12-port expansion board mounted underneath the 3rd level. ...
  • Page 162 ...
  • Page 163 ...
  • Page 164 Securely reconnect the entire third oor on top and then turn the battery pack to test all the lights are working OK ...
  • Page 165 ...
  • Page 166 41.) We will now install some lights to the cherry blossom tree on the fourth oor. ...
  • Page 167 ...
  • Page 168 ...
  • Page 169 Take out the 4x Pink 30cm Bit Lights and bend the tip of the of each light on a 90 degree angle as per below: ...
  • Page 170 ...
  • Page 171 Thread the connector end of the rst bit light down through the following hole of the tree piece. Pull the cable all the way down from underneath until the LED is sitting face up against the round hole. ...
  • Page 172 ...
  • Page 173 ...
  • Page 174 ...
  • Page 175 Bit Light should be sitting at against the white piece facing up Thread the connector end of the cable through the window underneath the branch piece and then pull it out from the inside as shown below. ...
  • Page 176 ...
  • Page 177 42.) Take another Pink 30cm Bit Light and then thread the connector end down through the following hole to the left of the previous light. ...
  • Page 178 ...
  • Page 179 ...
  • Page 180 Thread the connector end of the cable through the window underneath the branch piece and then pull it out from the inside as shown below. ...
  • Page 181 ...
  • Page 182 Tilt this tree section back to original position ...
  • Page 183 43.) Install another 2x Pink 30cm Bit Lights to the tree section toward the left following the images below to ensure you thread the lights through the correct holes. ...
  • Page 184 ...
  • Page 185 ...
  • Page 186 ...
  • Page 187 ...
  • Page 188 ...
  • Page 189 ...
  • Page 190 ...
  • Page 191 ...
  • Page 192 ...
  • Page 193 ...
  • Page 194 ...
  • Page 195 Tilt this tree section back to original position ...
  • Page 196 ...
  • Page 197 Both tree sections should be neatly positioned so that all four lights are shining up against the tree sections and branches above. ...
  • Page 198 44.) Take the remaining 6-Port Expansion Board and then connect the four pink light cables to it. ...
  • Page 199 ...
  • Page 200 Group all cables and loop them around each other, then twist them around each other to eliminate excess cable. ...
  • Page 201 ...
  • Page 202 45.) Turn the entire fourth oor onto its back so we can access underneath. ...
  • Page 203 Take 2x White Strip Lights, 2x LEGO 1×6 Plates and 2x 15cm Connecting Cables. ...
  • Page 204 Stick each strip light to the lego plate provided and then connect one of the connecting cables in between each strip light, and the other on the end of one of the strip lights. ...
  • Page 205 ...
  • Page 206 Ensuring the spare end of the 15cm connecting cable is facing right, mount the strip lights underneath the fourth oor in the below position: ...
  • Page 207 To prevent cables from dangling down, loop one side underneath the strip light plate as shown below: ...
  • Page 208 ...
  • Page 209 46.) Take the other end of the 15cm connecting cable and thread it through the doorway above that leads into the room with the tree branch. Pull the cable up from underneath and then connect it to a spare port on the 6-port expansion board. ...
  • Page 210 ...
  • Page 211 ...
  • Page 212 47.) Take the entire fourth oor above the rest of the building and then locate the other end of the 15cm connecting cable from the 12-port expansion board in the crab restaurant. Connect this into the other end of the strip light underneath the fourth oor.
  • Page 213 ...
  • Page 214 Securely reconnect the fourth oor to the rest of the building and then reconnect the level above the tree room. ...
  • Page 215 ...
  • Page 216 Turn on the battery pack to test all the lights are working OK. ...
  • Page 217 ...
  • Page 218 48.) We will now move onto lighting the rooftop and tower. First take the entire rooftop and disconnect the tower. Turn the rooftop onto it’s back so that we can access underneath. ...
  • Page 219 ...
  • Page 220 ...
  • Page 221 ...
  • Page 222 Take 2x White Strip Lights and then stick them both onto 2x LEGO 1×6 Plates. Join the two strip lights together using a 5cm Connecting Cable ...
  • Page 223 ...
  • Page 224 Take another White Strip Light (strip light 3)and stick it onto another LEGO 1×6 Plate. Take a 15cm Connecting Cable and connect it to strip light 3. ...
  • Page 225 ...
  • Page 226 Connect the other end of the 15cm Connecting Cable to the other end of strip light 2 and then take another 15cm Connecting Cable and connect it to the other end of the strip light 3. ...
  • Page 227 ...
  • Page 228 Take another 15cm Connecting Cable and connect this to the other end of strip light ...
  • Page 229 49.) Mount the three strip lights underneath the rooftop in the following positions. ...
  • Page 230 Lay the cable between strip light 2 and 3 underneath the following plate. ...
  • Page 231 ...
  • Page 232 50.) Pull the other end of the 15cm connecting cable from strip light 3 across to the left and then lay it in between the following bricks. ...
  • Page 233 ...
  • Page 234 Take the entire roof top section over the rest of the building and then connect the other end of the 15cm connecting cable from strip light 1 into the remaining spare port on the 6-port expansion board inside the cherry blossom tree room. ...
  • Page 235 ...
  • Page 236 ...
  • Page 237 ...
  • Page 238 Turn on the battery pack to verify all the lights are working ok ...
  • Page 239 51.) Take another White Strip Light and connect a 30cm Connecting Cable to one end of it. ...
  • Page 240 ...
  • Page 241 Locate the other end of the 15cm Connecting Cable from strip light 3 in step 50 and connect it to the other side of the strip light then using it’s adhesive backing, stick the strip light to the top of the balcony rail as per below: ...
  • Page 242 ...
  • Page 243 Eliminate excess cable (15cm cable) by pulling it over the wall and then securing underneath the black tile. ...
  • Page 244 ...
  • Page 245 Turn the battery pack on to verify that the strip light is shining directly up underneath the puffer sh. ...
  • Page 246 ...
  • Page 247 52.) Remove the following tile from the base of the tower and replace it with the provided LEGO 1×7 Dark Grey Plate. This will better secure the tower to the roof as we found that it was quite imsy without the extra studded plate. ...
  • Page 248 ...
  • Page 249 ...
  • Page 250 ...
  • Page 251 53.) Take another White Strip Light and connect another 15cm Connecting Cable to one side. ...
  • Page 252 ...
  • Page 253 Locate the other end of the 30cm Connecting Cable from the strip light on the rail and then connect this to the other end of the new Strip Light. ...
  • Page 254 Stick the strip light to the wall underneath the sushi train table as per below ...
  • Page 255 ...
  • Page 256 54.) Hide the large 30cm cable by laying it in between the rail tables and chairs on the roof top. ...
  • Page 257 ...
  • Page 258 ...
  • Page 259 ...
  • Page 260 ...
  • Page 261 ...
  • Page 262 Turn on the battery pack to test the strip lights on the roof top are working OK. ...
  • Page 263 55.) Take the tower and then remove the middle and bottom sections. ...
  • Page 264 ...
  • Page 265 ...
  • Page 266 ...
  • Page 267 Disconnect the trans orange cone piece from the top of the tower and then take a Flashing White 30cm Bit Light and place it over the stud below (with cable facing the back). Secure the light in place by reconnecting the trans orange cone piece. ...
  • Page 268 ...
  • Page 269 ...
  • Page 270 56.) Turn the tower to the back and then disconnect the left wall section ...
  • Page 271 ...
  • Page 272 Disconnect the beacon section from the dark grey round brick and then lay the cable underneath it. Reconnect this section to secure the cable. ...
  • Page 273 ...
  • Page 274 ...
  • Page 275 57.) Take a Blue Strip Light and connect the remaining 15cm Connecting Cable to one side. ...
  • Page 276 ...
  • Page 277 Take the top section of the tower above the middle section and then thread the cable from the Flashing White 30cm Bit Light down one of the spaces of the round feature underneath. ...
  • Page 278 ...
  • Page 279 Pull the cable down from above and then connect it to the other end of the blue strip light. ...
  • Page 280 58.) Using it’s adhesive backing, stick the blue strip light to the center of the roof of the round feature as per below. ...
  • Page 281 ...
  • Page 282 Tuck the excess cable from the ashing white bit light up into the space above. ...
  • Page 283 59.) Reconnect the wall section we disconnected on back of the top section of the tower and then eliminate excess cable from the ashing white bit light by tucking it down in between wall sections. ...
  • Page 284 ...
  • Page 285 ...
  • Page 286 ...
  • Page 287 ...
  • Page 288 60.) Take the other end of the 15cm connecting cable from the blue strip light and then thread it behind to the back. Secure the cable underneath the dark grey brick on the side. ...
  • Page 289 ...
  • Page 290 ...
  • Page 291 ...
  • Page 292 61.) Take the remaining White Strip Light and stick it onto the LEGO 1×6 plate. Connect the other end of the 15cm connecting cable from the blue strip light to the White Strip Light. ...
  • Page 293 ...
  • Page 294 Mount the White Strip Light underneath the middle tower section in the below position. Loop the cable and secure it underneath the plate to eliminate excess cable. ...
  • Page 295 ...
  • Page 296 62.) Reconnect the bottom section of the tower and then locate the other end of the 15cm connecting cable from the strip light underneath the sushi train table and then connect this to the other end of the White Strip Light underneath the middle section of the tower.
  • Page 297 ...
  • Page 298 ...
  • Page 299 ...
  • Page 300 ...
  • Page 301 63.) Securely reconnect the upper levels of the tower to the bottom section. ...
  • Page 302 ...
  • Page 303 Turn on the battery pack and con rm all the lights on the roof top and tower are working OK. ...
  • Page 304 ...
  • Page 305 This nally completes installation of the Ninjago City Light Kit. ENJOY! ...
  • Page 306 ...
  • Page 307 ...
  • Page 308 ...