Advertisement

Quick Links

1. Site Survey........................................................................................ 2
2. Inflatable Inclusions ........................................................................... 2
3. Intended use of product .................................................................... 3
4. Operating guidelines ......................................................................... 3
5. Troubleshooting ................................................................................ 4
6. Hazards relating to electrical equipment ........................................... 5
7. Setup ................................................................................................ 5
7.1 Assembly of the mechanism ..................................................... 5
7.2 Assembly of the sealed arm ..................................................... 8
7.3 Assembly of the bed ................................................................. 9
7.4 Assembly of the Control Panel ................................................. 10
7.4.1 The Control Box ............................................................. 10
7.4.2 Transporting and storing ................................................. 10
7.4.3 Positioning of the Control Panel...................................... 11
8.1 Routine Inspections ................................................................... 11
8.2 Trial runs ................................................................................... 12
8.3 Thorough examination ............................................................... 12
9. Spare Part Codes ............................................................................. 12
Contents
Page 1 of 14

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Last One Standing and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for airquee Last One Standing

  • Page 1: Table Of Contents

    Contents 1. Site Survey..................2 2. Inflatable Inclusions ................2 3. Intended use of product ..............3 4. Operating guidelines ................. 3 5. Troubleshooting ................4 6. Hazards relating to electrical equipment ........... 5 7. Setup ....................5 7.1 Assembly of the mechanism ............. 5 7.2 Assembly of the sealed arm .............
  • Page 2: Site Survey

    YOUR OWN RISK ASSESSMENT BEFORE ATTEMPTING TO USE THIS PRODUCT. 1. Site survey: 1. Carry out a survey of the area where the Last One Standing will be located, and check for any overhead/underground cables. It’s important that this is carried out to avoid ground anchors penetrating underground services, and the Last One Standing coming into contact with overhead cables when inflated.
  • Page 3: Intended Use Of Product

    3. Intended use of the product: The Last One Standing with a single arm mechanism is designed to be used by up to eight players and one operator. The players must bounce at the right time to avoid the rotating sealed arm.
  • Page 4: Troubleshooting

    If you are sure that this is the case, and we would need to change Cycle times of acceleration Tilda@airquee.co.uk the values, please contact for further /deceleration: assistance.
  • Page 5: Hazards Relating To Electrical Equipment

    If you still have issues with the mechanism, please contact Airquee customer support on the following number +44 (0)1179 414 918. To avoid getting an error code: Make sure the electric power supply is stable and not fluctuating in any way.
  • Page 6 The mechanism consists of: Sealed Tube Drive Motor Bed Hole Webbing + Drive Motor with PVC cover Foam Cover Foam Cover Cover Bungee Cord AP2963 AP2786 AP3149 AP3152 MP0024 Arm Bar Middle Bar Wheels Legs Leg Covers Wrenches MP0049 MP0022 MP0004 MP0003 AP3151...
  • Page 7 Exchange the wheels with the legs. MAKE SURE THE SURFACE WHERE YOU PLACE THE MECHANISM IS LEVEL. Insert the Middle Bar into the Drive Motor’s shaft and tighten the bolts at the desired height. We recommend the second and third holes at least. MAKE SURE BOTH...
  • Page 8: Assembly Of The Sealed Arm

    DO NOT INFLATE THE SEALED ARMS BEFORE YOU SLIP IT ON THE ARMBAR! 7.2 Assembly of the sealed arms: Slip the Sealed Arm on the Arm Bar, using the highlighted hole. Inflate the Sealed Arm through the valve with the help of the supplied handpump. When deflating the Sealed Arm, you must PUSH THE MIDDLE OF THE...
  • Page 9: Assembly Of The Bed

    Connect the drive motor to the control panel with the 12m cable. The electric socket can be found inside the drive motor. 7.3 Assembly of the bed: Start connecting the sandwich Velcro flaps. The easiest way to connect the flaps is to first patch the lower part of the Velcro all the way, then cover the top part of the right side soft Velcro with the left side hard Velcro flap.
  • Page 10: Assembly Of The Control Panel

    7.4 Assembly of the Control Panel: The Control Panel consists of: ON/OFF Triangle Control Box Support Bar Legs 12M Cable 3M Cable AP2785 MP0013 MP0012 MP0056 MP0015 MP0008 MP0009 You must bolt these 3 parts together. 7.4.1 The Control Box: 1.
  • Page 11: Positioning Of The Control Panel

    SHALL PERSONALLY CHECK that the setup of the Last One Standing is correct. We recommend to check for every criteria written below. The person carrying out the check shall be sufficiently trained or experienced in the check routines that have to be carried out.
  • Page 12: Trial Runs

    NOW ARE THE PLAYERS ALLOWED TO ENTER THE UNIT. 8.3 Thorough examination Besides the regular checks, the Last One Standing should be thoroughly examined at appropriate intervals by a competent person/institute/organization/company. The intervals between two successive thorough examinations may be governed by existing national regulations: 9.
  • Page 13 MP0019 - Potentiometer MP0022 - Middle Bar MP0027 - Allen Wrench To assemble\disassemble the mechanism. MP0029 - 13mm Wrench To assemble\disassemble the mechanism. To assemble\disassemble the mechanism, to connect the inflatable MP0030 - 19mm Wrench arm to the middle bar. MP0049 - 1M Metal Arm for Mechanism with To connect the inflatable arm to the middle bar.
  • Page 14 Manual. It is the user's responsibility to determine whether there have been any such updates or amendments. Neither Airquee Ltd nor any of its directors, officers, employees or agents shall be liable in contract, tort or in any other manner whatsoever to any person for any loss, damage, injury, liability, cost or expense of any nature, including without limitation incidental, special, direct or consequential damages arising out of or in connection with the use of the Manual.

Table of Contents