Page 2
The Mini Infinity 2 Auto Spa cover is a system that can be installed in cover boxs that have a width between 10 -14 inches, including our polymer housing. It also offers lower offsets than the full sized Infinity 4000 system.
Page 3
Parts Reference Mechanism Components Cover Fabric Cover Pump Cover Track Cover Lid Lid Support Bracket Cover Pump Side view Top view Parts List 15/16 Parts List Misc. Hardware 1. 10160 Gear motor 3/4 HP Tuck Under H0294 Carriage bolt 1/4-20 x 3/4" 2.
Page 5
Step By Step Instructions Numbers in parenthesis refer to parts shown on page 3. To determine if the cover system was Position the cover track along both sides of Cut the length of the track on each side of ordered correctly for the pool, the length of the pool.
Page 7
Step By Step Instructions System Components Both Recessed Horizontal and Slim Flush Tracks consist of 3 parts, the track housing, the track, and the locking strip. End pulley assembly - This can either be installed when the housing is installed or at the time the mechanism is installed. Track protector: It is important to protect the track while the concrete deck is being poured.
Step By Step Instructions Numbers in parenthesis refer to hardware shown on page 3. Assembling the Mechanism. Attach the roll-up tube to the motor end of Attach the roll-up tube to the non-motor end the mechanism using the 3/8” x 1-1/4” bolts of the mechanism using the 3/8”...
Page 10
Step By Step Instructions Numbers in parenthesis refer to hardware shown on page 3. Loosen the bolts on the adjustable brackets With the brackets in position, place a small With the brackets on the non-motor end in level across them to make sure they are level. on the non-motor end of the mechanism.
Electrical Wiring & Bonding The system must be bonded to meet the National Electrical Code. Bond both tracks to the mechanism by attaching a bonding lug to the guide screw and running a #8 solid copper bond wire to the mechanism. Bond the lid to the mechanism by drilling a hole in the lid at either end of the lid and attaching a bonding lug in each position and bonding it to the mechanism.
Step By Step Instructions Numbers in parenthesis refer to parts shown on page 3 Opening the Cover Box Standing behind the housing looking over Uncoil the ropes to remove twists and kinks. the pool, unroll the cover from left to right. Run the ropes through the tracks.
Step By Step Instructions Numbers in parenthesis refer to hardware shown on page 3. On the motor end, feed the rope around On the non-motor end, feed the rope Pull the rope around the vertical pulley on the first and second horizontal pulleys on around the pulley of the non-motor end the front wall of the cover box.
Page 15
Step By Step Instructions Numbers in parenthesis refer to hardware shown on page 3. Slide the Stop Plate Support Splice (48) Position the top half of the positive stop (46) Press the beveled side of the positive stop into the track. Line up the holes in the over the webbing of the cover.
Step By Step Instructions Numbers in parenthesis refer to hardware shown on page 3. On the side of the cover that hasn’t been Attaching the Leading Edge Tube Adjust the height of the wheel assembly so pulled in the track yet, slide the leading the leading edge will clear any obsticles File the edges of the rope channel before edge tube on the rope hem along the front...
Operate the cover several times to and make any adjustments to the rope reel brake and roll-up tube brake if necessary. The Mini Infinity 2 installation is complete. Using a self-tapping screw (32) , attach the bonding wire on both sides of the roll-up tube.
Page 18
Step By Step Instructions Calibrate Touch Pad Control Switch The touch pad can be calibrated for the specific pool it is installed on. This calibration will teach the touch pad what the electrical current consumption is (for retrofit models) and what the transit operation time will be in normal operation. The touch pad utilizes this information to determine over currents and cycle calculations.
Page 19
Step By Step Instructions HOME OWNER CHECKLIST After the cover system is installed, it is critically important to instruct the home owner on how to operate the cover system safely and do routine maintainence. Use the following check list and the homeowner guide as your primary instruction sources.
Page 20
Installation Checklist Tracks q All track ends filed. This is extremely important. q Cover goes through the track joints smoothly. q All track screws are tight and flush. q Pulleys are flush against the end of the track. q The guides are snug against the track. q Guides bolted in and are tight.
Need help?
Do you have a question about the Mini Infinity 2 and is the answer not in the manual?
Questions and answers