DLP3021LEQ1EVM Evaluation Module
TI's DLP
®
technology offers a fully programmable and high-resolution solution for automotive dynamic ground
projection (DGP) applications. With nearly half a million addressable pixels per module using a WVGA (864
× 480) input resolution, DLP technology exceeds the resolution of existing ground projections technologies.
Dynamic ground projection technology, with the ability to display any static or video pattern within the same
module, can re-invent consumers' perceptions on small projector lighting by providing new, innovative lighting
capabilities. Examples include automotive light "carpets" that can illuminate the surrounding area outside a
vehicle or project vehicle information such as the EV charge level and range remaining, tire pressure warnings,
traffic warnings, turn signaling, check engine light warning, gas level/range, etc. from a side mirror. Ground
illumination has other enhancement features to help cars communicate with drivers and pedestrians, including
corner lighting, reverse lighting, vehicle customization, and parking indicators.
The DLP3021LEQ1EVM is the DLP3021-Q1 Light Engine Evaluation Module (EVM) that allows for accelerated
evaluation of the DLP3021-Q1 chipset with the inclusion of a DLP3021-Q1 light engine. This module brings
together a set of components including the DLP3021-Q1 DMD, the FPGA based DMD controller, and the
TPS65100 PMIC to provide an efficient system for evaluation of dynamic ground projection technology. When
combined with a computer for GUI control, the evaluation module can be used in a laboratory setting to
demonstrate features such as:
1 DLP3021-Q1 Electronics EVM Overview..............................................................................................................................
1.1 Introduction........................................................................................................................................................................
1.3 Non-Optical Specifications.................................................................................................................................................
Start.............................................................................................................................................................................10
2.1 Kit Assembly Instructions.................................................................................................................................................
2.2 Software Installation.........................................................................................................................................................
2.3
Power-Up..........................................................................................................................................................................11
2.4 Select Display Content.....................................................................................................................................................
Driver........................................................................................................................................................................12
Mechanics..........................................................................................................................................................14
4
Software.................................................................................................................................................................................15
Composer.................................................................................................................................................................15
Program.......................................................................................................................................................22
Code...................................................................................................................................................25
5 Revision History...................................................................................................................................................................
Figure 1-1. DLP3021LEQ1EVM Block Diagram..........................................................................................................................
Figure 1-2. DLP3021LEQ1EVM Unit...........................................................................................................................................
Figure 1-4. Operating Mode Switches: SPI Adapter Board S1 and S2 Switches........................................................................
Figure 1-6. LED Driver Timing Specifications..............................................................................................................................
Figure 2-1. Cable Connections..................................................................................................................................................
Figure 2-2. Assembled DLP3021-Q1 Light Engine EVM with FTDI..........................................................................................
Figure 2-3. Host Mute Operating Mode LED Status..................................................................................................................
Figure 4-1. DLP Composer - Default Register Configuration....................................................................................................
DLPU106A - MARCH 2021 - REVISED OCTOBER 2021
Submit Document Feedback
ABSTRACT

Table of Contents

EVM..................................................................................................................3
List of Figures
FTDI......................................................................................................8
GUI..........................................................................................12
Copyright © 2021 Texas Instruments Incorporated
Table of Contents
..................................................................5
DLP3021LEQ1EVM Evaluation Module
3
3
8
10
11
11
26
4
4
5
9
10
10
11
15
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DLP3021LEQ1EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments DLP3021LEQ1EVM

  • Page 1: Table Of Contents

    The DLP3021LEQ1EVM is the DLP3021-Q1 Light Engine Evaluation Module (EVM) that allows for accelerated evaluation of the DLP3021-Q1 chipset with the inclusion of a DLP3021-Q1 light engine. This module brings together a set of components including the DLP3021-Q1 DMD, the FPGA based DMD controller, and the TPS65100 PMIC to provide an efficient system for evaluation of dynamic ground projection technology.
  • Page 2 Table 4-1. Top Level Flash Structure............................Table 4-2. Flash Information Block............................Trademarks ® is a registered trademark of Texas Instruments. All trademarks are the property of their respective owners. DLP3021LEQ1EVM Evaluation Module DLPU106A – MARCH 2021 – REVISED OCTOBER 2021 Submit Document Feedback Copyright ©...
  • Page 3: Dlp3021-Q1 Electronics Evm Overview

    Q1 chipset. 1.1 Introduction The DLP3021LEQ1EVM Evaluation Module (EVM) is a complete electronic and optical subsystem designed to control and interface with the DLP3021-Q1 chipset. The DLP3021-Q1 interfaces with an FPGA based DMD controller. This chipset is combined with illumination and projection optics, and RGB LEDs to create a projector that offers brightness of up to 30 lumens with full motion video playback in a small volume form factor.
  • Page 4: Figure 1-1. Dlp3021Leq1Evm Block Diagram

    DLP3021-Q1 Electronics EVM Overview www.ti.com Figure 1-1. DLP3021LEQ1EVM Block Diagram Figure 1-2 shows the assembled DLP3021LEQ1EVM Unit. Figure 1-2. DLP3021LEQ1EVM Unit DLP3021LEQ1EVM Evaluation Module DLPU106A – MARCH 2021 – REVISED OCTOBER 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 5: Figure 1-3. Operating Mode Switches: Electronics Board S1-A And S1-B Switches

    Figure 1-4. Operating Mode Switches: SPI Adapter Board S1 and S2 Switches Table 1-1 for the switch positions required of each operating mode. DLPU106A – MARCH 2021 – REVISED OCTOBER 2021 DLP3021LEQ1EVM Evaluation Module Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 6: Table 1-1. Dlp3021Leq1 Evm Operating Mode Switch Positions

    This mode is unsupported by the EVM and should not be used. To allow the SPI Adapter board to set the operating mode, TI recommends the DLP3021LEQ1EVM electronics board S1 switches always be set to Local Host Control mode. This is because the On-state of either board will always override the Off-state of the other board.
  • Page 7: Table 1-2. Light Engine Performance Specifications

    The duty cycle of each RGB can only be configured in DLP Composer as part of a list of Sequence Settings. 1.2.3 Light Engine The light engine included with the DLP3021LEQ1EVM can expect to achieve the specifications listed in Table 1-2.
  • Page 8: Non-Optical Specifications

    : Though the LED driver of the EVM is capable of driving above 1 A per channel, TI does not recommend driving beyond 500 mA for extended periods to prevent damage to the EVM due to individual component temperature ratings and thermal management limitations. : Values based on DLP3021LEQ1EVM LED Part Numbers at 500-mA driver: •...
  • Page 9: Figure 1-6. Led Driver Timing Specifications

    864 × 480. The controller synchronizes the DMD bit plane data with the RGB enable timing for the LED color controller and driver circuit. DLPU106A – MARCH 2021 – REVISED OCTOBER 2021 DLP3021LEQ1EVM Evaluation Module Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 10: Quick Start

    TDO (4) Green J5-3 TDI (3) Yellow J5-5 TMS (5) Brown J5-7 Figure 2-2. Assembled DLP3021-Q1 Light Engine EVM with FTDI DLP3021LEQ1EVM Evaluation Module DLPU106A – MARCH 2021 – REVISED OCTOBER 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 11: Software Installation

    If the FTDI cable is not already connected, click the Connect button. Note, the Connection settings must be a clock rate of 5 MHz and timeout of 500 ms. DLPU106A – MARCH 2021 – REVISED OCTOBER 2021 DLP3021LEQ1EVM Evaluation Module Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 12: Led Driver

    LEDs in certain LED configurations. Table 2-2 provides reference conversions from PWM level to drive current for commonly used current levels. DLP3021LEQ1EVM Evaluation Module DLPU106A – MARCH 2021 – REVISED OCTOBER 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 13: Table 2-2. Led Pwm Drive Current Conversion Reference

    DMD controller must be set to disable the PWM outputs. Note The RGB LEDs included with the DLP3021LEQ1EVM have maximum continuous forward current ratings of 0.5 A, and maximum forward current pulsed ratings of up to 1 A.
  • Page 14: Optics And Mechanics

    Both optics and recommended heat sinks (DMD and LED) are included with the DLP3021-Q1 Light Engine EVM. These heat sinks have been designed to operate the DLP3021-Q1 DMD and LEDs within their data sheet specifications. DLP3021LEQ1EVM Evaluation Module DLPU106A – MARCH 2021 – REVISED OCTOBER 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 15: Software

    DLP Composer for DLP3021-Q1 is a software tool that allows users to configure and generate firmware flash data for the DMD controller of the EVM. In the case of the DLP3021LEQ1EVM, the firmware file generated is specific to the FPGA based DMD controller, and loaded into external SPI flash memory. The DMD controller executes commands to read image/video content from the SPI flash memory, and processes the content into the Data Rate (DDR) interface format compatible with the DLP3021-Q1 data bus.
  • Page 16: Figure 4-2. Dlp Composer - Illumination

    The duty cycling of each color is made possible through the use of a multiplexer with active channel selection by the PWM_SEL_0 and PWM_SEL_1 pins of the FPGA. This, in combination with the overall LED driver, PWM DLP3021LEQ1EVM Evaluation Module DLPU106A – MARCH 2021 – REVISED OCTOBER 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 17: Figure 4-4. Dlp Composer - Degamma Curves

    See the DLP5531-Q1 Chipset Video Processing for Light Control Applications (DLPA101) for additional details on the effects of gamma curves. DLPU106A – MARCH 2021 – REVISED OCTOBER 2021 DLP3021LEQ1EVM Evaluation Module Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 18: Figure 4-5. Dlp Composer - Image/Video

    The flash memory for the DGP system is divided into five major blocks. Creation of the flash binary is handled entirely by DLP Composer. The FPGA Configuration for the Xilinx XA7S15-1CPGA196Q Spartan®-7 FPGA is already compiled and included with the example project provided by Texas Instruments. DLP3021LEQ1EVM Evaluation Module DLPU106A –...
  • Page 19: Figure 4-6. Dlp Composer - Flash Blocks

    The flash information block provides metadata regarding the contents of the flash. This is intended to allow an external MCU or software tool understand the contents of the flash. For example, it defines the locations of the DLPU106A – MARCH 2021 – REVISED OCTOBER 2021 DLP3021LEQ1EVM Evaluation Module Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 20: Table 4-2. Flash Information Block

    The default configuration block is the set of values for each of the FPGA registers. This information is loaded by the FPGA after the completion of the FPGA configuration. These values supersede the power-on default values DLP3021LEQ1EVM Evaluation Module DLPU106A – MARCH 2021 – REVISED OCTOBER 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 21: Figure 4-7. Dlp Composer - Flash Programming

    Figure 4-8. Flash Programming Operating Mode LED Status 5. Import and open the DLP3021LEQ1EVM DGP project in DLP Composer. 6. Navigate to the Connections tab. Set to SPI and FTDI SPI Port, then click the Connect button. The virtual...
  • Page 22: Dlp Control Program

    SPI to read/write registers, enable video playback, change videos, read DMD temperature via the TMP411, or adjust current levels to the LEDs. To change the DLP Control Program window and pages for DLP3021LEQ1EVM support, navigate to Product → Dynamic Ground Projection for Automotive in the menu bar.
  • Page 23: Figure 4-10. Dlp Control Program - Connection

    Stop Script button at the top of the page. DLPU106A – MARCH 2021 – REVISED OCTOBER 2021 DLP3021LEQ1EVM Evaluation Module Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 24: Figure 4-12. Dlp Control Program - Scripting Reference

    The Registers page allows users to perform individual read/writes of the block, register, or bit fields of the FPGA registers. Figure 4-13. DLP Control Program - Registers DLP3021LEQ1EVM Evaluation Module DLPU106A – MARCH 2021 – REVISED OCTOBER 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 25: Msp430 Example Code

    LEDs. The MSP430 Example Code (DLPC138) is a Code Composer Studio example project available for users to edit and refer to for a custom Local Host Control operation mode implementation. DLPU106A – MARCH 2021 – REVISED OCTOBER 2021 DLP3021LEQ1EVM Evaluation Module Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 26: Revision History

    Corrected script from "VideoControl.ToggleConfigs = TrueWrite" to "VideoControl.ToggleConfigs = True" in Select Display Content .............................11 • Corrected script from "VideoControl(VideoControl)" to "WriteVideoControl(VideoControl)" in Select Display Content ................................11 DLP3021LEQ1EVM Evaluation Module DLPU106A – MARCH 2021 – REVISED OCTOBER 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 27 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 28 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 29 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 30 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 31 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...
  • Page 32 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products.IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2021, Texas Instruments Incorporated...