Connecting Rs485 Cable To Acp - LG PQCPA11A0E Installation & Owner's Manual

Advanced control platform air conditioner
Table of Contents

Advertisement

2. Installing ACP

Connecting RS485 cable to ACP

After fixing the ACP at the installation place, the RS485 cable connecting the PI485 to the ACP.
Connect the RS485 cable to the ACP as follows:
1.
The end of the RS485 cable connecting to the BUS_A of the PI485 of the connector possible to be
connected to the ACP to the TX. Next, connect the end of the RS485 cable connecting to the
BUS_B of the PI485 to the RX.
Caution: Connecting the RS485 communication cable
Because the connection of the RS485 communication cable has a polarity, be careful
that the connection of two cables is not changed.
2.
The RS485 cable connecting to the PI485 to the LG-NET port (RS485 port) of the ACP. Connect
the connector connecting the RS485 cable to one of the ports LG-NET1~LG-NET4. The number of
LG-NET ports is 1~4 and it is possible to connect to any of them to use.
2-20
ACP
1
D I
2
3
4
5
6
7
8
9
1 0
1 1
1 2
1 3
1 4
1 5
1 6
1 7
1 8
1 9
2 0
M E N
U /
S E L E
C T
1
D O
2
3
4
L G -N
E T 1
T X
R X
L G -N
E T 2
T X
R X
L G -N
E T 3
T X
R X
L G -N
E T 4
T X
R X
F D D
T X
R X
E x t.
T X
R X
E th e
r n e t
1
A C T
L N K
E th e
r n e t
2
A C T
L N K
C o n s
o le
T X
R X
R u n
P o w
e r
RS485 - TX
RS485 - RX

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pqcpb11a0e

Table of Contents