Figure 3. Single Phase Control Box Power Connections
1. Remove the control box cover.
2. Insert power supply through the power cable gland.
3. Make the following connections:
Connect power lead to L1
Connect neutral lead to L2
Connect ground lead to PE
4. Check terminals to insure they are tight.
5. Close the box.
6. Check the hoist operation
This document and the information contained herein, is the exclusive property of R&M Materials Handling, Inc., and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials Handling, Inc.