Download Print this page

Screen Innovations Nano 375 Box Installation Instructions Manual page 5

110v ac - rts

Advertisement

INSTALLATION - NANO BOX - 110v AC - RTS
1. Install the wall brackets 4 - 6 inches in from the end of the shade with the supplied screws.
(The closer to the end of the cassette, the better)
4" - 6"
2. Make sure the wall bracket lever is down (may already be down).
3. Push power cable into pre-wire hole
Installation - Nano Box -110v AC - RTS
Proper position for installing Box
Note: Motor cable is not plenum
rated. Terminate accordingly.
4" - 6"
3

Advertisement

loading

This manual is also suitable for:

Nano 475 box