Electrical Connections - Riello INSIEME EVOe 32 B/110 LN Installation And Maintenance Manual

Hide thumbs Also See for INSIEME EVOe 32 B/110 LN:
Table of Contents

Advertisement

INSTALLATION
Automatic shut-off device (not supplied)
NC
RE
MO4
C
L
N
Ph
N
Ph
N
RE
Timer relay (not supplied)
MO4
Terminal strip
MO5
Terminal strip
X6
6 pin burner connector (female)
XP6
6 pin burner connector (male)
DAI
Automatic shut-off device (not supplied as a
standard and valid only if required). The coil of the
automatic shut-off device (ASD) and the relay (RE)
must be chosen for a power supply of 230Vac.
The relay (RE) delays the closure of the fuel shut-off valve
(DAI), to prevent a void in the line section between the pump
and the valve.
DAI
NC
C
MO5
N
N HD E
R HD E
1
2
3
1
2
3

2.13 Electrical connections

The INSIEME EVOe 32 B/110 LN boiler is fully cabled in the factory.
The only connections required for its installation are those of
the mains power supply, room thermostat and other optional
system components.
Proceed as follows to access the control panel terminals:
− open the control panel door and remove the fixing screw
(2);
− remove the front panel (1) and lift it by pulling it towards
yourself;
2
1
− remove the fixing screw (3) from the top of the control
panel;
3
26

Advertisement

Table of Contents
loading

This manual is also suitable for:

20118250

Table of Contents