Installation; Package Contents - Abb Cp430 Installation And Operation Manual

Human machine interface
Table of Contents

Installation

2
Installation
2.1

Package Contents

The following parts are found in the box:
– Operator terminal CP430
– 4 installation fasteners
– Power connector (connected to the 24 V DC power outlet)
– Printer cable (only for CP430 B-ETH, CP430 C and CP430 C-ETH)
– This installation and operation manual (1SBC159103M0201)
ABB, 1SBC159103M0201
7

Hide quick links:

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CP430 and is the answer not in the manual?

This manual is also suitable for:

Cp430 c-ethCp430 cCp430 bCp430 b-eth

Table of Contents