Page 1
DESIGNER SERIES MODELS INSTALLATION AND USER’S MANUAL MODELS: READ AND SAVE THESE DS-30-F INSTRUCTIONS DS-30-D DS-30-D-IF https://www.denlarhoods.com/...
Page 2
Use this unit in the manner intended by the Manufacturer. If you have questions or concerns, please contact Denlar Service at 860-526-9846 or service@denlarhoods.com. Before servicing the Hood, turn off power at the Main Breaker Panel. Ensure the Breaker is locked- out/tag-out in accordance with local codes.
DESIGNER SERIES SCHEMATIC DESIGNER SERIES DEVICE FLOW CHART For the Warranty Statement please visit https://www.denlarhoods.com/. For installation or service calls please contact Denlar Service at 860-526-9846 or at service@denlarhoods.com. For sales questions, please contact Denlar Sales at 860-526-9846 or at sales@denlarhoods.com.
MOUNTING LAYOUT A. DENLAR Designer Series Hood(DS-30) B. Range (for reference purposes (Gas, Electric or Dual Element) C. Electric Power disconnect (shown) D. Gas Power Disconnect (not shown) E. The CLOCKBOX range element lockout system (CLBX option) The Touchscreen (E) is shown, the control module is not shown.
Page 8
MOUNTING LAYOUT The Hood has two options for mounting. There are four mounting holes in the top and rear of the unit. If a cabinet is installed above the Hood with top discharge or an inline fan, then a 7” hole is needed in the cabinet.
POWER CONNECTIONS Clock Box 120 VAC Input (not provided) CB1 / CB2 Control Box Touch Screen Electrical Disconnect 1. 120 VAC Input (not provided) a. 120 VAC / 15 Amp circuit (provided by installer) i. If a Clock Box is not used, connect the wire directly to the Hood, skip to Step 3. 2.
Page 10
POWER CONNECTIONS See Power Connections on Page 8 3. 120 VAC Input Power Cable (not provided) a. Remove the side cover of the Hood, there is a six-position connector in the compartment. The wire combination is Brown, White, Green, Green, White, and Blue. The mating connector is attached to the plug.
Page 11
POWER CONNECTIONS See Power Connections on Page 8 5. Cable (not provided) to provide 120 VAC from the Main Breaker Panel to the Clock Box (if applicable) a. Connect the 120 VAC Output Cable to the Installer Side of eight (8) position Power Plug in the Clock Box Control Box i.
OPERATING THE DESIGNER SERIES HOOD The Designer Series Hood is equipped with two switches. The Switch on the right is for the two lights in the Hood. The switch on the left is for the fan motor. This switch is a three-position rocker switch.
MANUAL PULL STATION INSTALLATION (MPK) STEP 1: INSTALLING CONDUIT Mount the Pull Box in an appropriate location according to local building codes. The MPK is supplied with 25 Ft of wire rope cable and three Elbow Pulleys as our listing requires.
ALARM CONNECTIONS The Designer Series Hood offers a set of Normally Open (NO) or Normally Closed (NC) Contacts to connect to an alarm panel. To access the connection, remove the side cover, there are three red wires inserted into a Four-Position Connector, this mating connector is plugged into the four-position connector.
RANGE ELEMENT DISCONNECT INSTALLATION DS-G Installation Gas Solenoid Disconnect 1. Secure the gas line input and output to the DS-G. The fittings are 3/8” NPT. Make note of the direction of the flow, there is an arrow on the bottom of the DS-G. 2.
HANDICAP ACCESSIBLE CONTROL (ADA) COMPONENTS • ADA Wire Harness Assembly o (2) Toggle Switches (white) o (1) Metal 2-Gang Enclosure o (15 ft) Plenum Cable Encased in 16mm ENT Flexible Conduit o (1) Eight-Position Male Connector (Plug-N-Play) o (1) 2-Gang White Switch Cover o (2) Mounting Brackets PREPARATION Turn OFF the supply line 110-120 VAC power (at the panel) to the Hood.
Page 19
HANDICAP ACCESSIBLE CONTROL (ADA) LAB-110246 REV 20210312...
If a Manual Pull Station is installed, remove the swivel hook from the glass link. Using a 3/8” socket or Nut Driver, remove the two Tank Securing Nuts. The Designer Series Tank Assembly can be removed safely at this time. To reinstall the Designer Series Tank Assembly, reverse this process.
DESIGNER SERIES TESTING Testing the Designer Series Hood Fan and Light 1. Turn the Light Switch ON and ensure both lights turn ON. 2. Turn the Light Switch OFF and ensure both lights turn OFF. 3. The Fan Switch is a Three-Position rocker switch.
Page 22
If a Manual Pull Station is installed, remove the swivel hook from the glass link. d. Using a 3/8” socket or Nut Driver, remove the two Tank Securing Nuts. The Designer Series Tank Assembly can be removed safely at this time.
DESIGNER SERVICE Before servicing the Designer Series Hood, install the Safety Pin for the tank to prevent an accidental discharge. Inspection: 1. Verify that all components are clean, non-damage, and have no corrosion. Corrosion could be a sign that there is an issue with the tank.
Need help?
Do you have a question about the DESIGNER Series and is the answer not in the manual?
Questions and answers