Mounting/Installation; Ann-Rly Board Layout And Connection To Facp - Honeywell Fire-Lite Alarms MRP-2001 Instruction Manual

Pre-action/deluge control panel
Table of Contents

Advertisement

ANN-BUS Devices

Mounting/Installation

The ANN-RLY relay module can be mounted inside the FACP main circuit board chassis. An
optional ANN-MBRLY mounting bracket allows mounting of the ANN-RLY in the lower right
hand corner of the FACP cabinet instead of or in conjunction with the mounting provisions under
the main FACP circuit board chassis. Refer to the documentation supplied with the module for
information on installation.

ANN-RLY Board Layout and Connection to FACP

Figure 2.23 illustrates the ANN-RLY board showing locations of screw terminals for connection to
the FACP and the DIP switches for selecting the ANN-BUS ID number.
MRP-2001 Series Manual — P/N 53040:H 1/26/2017
ANN-BUS (ID#)
Address DIP switch
FACP
-24 VDC
+24 VDC
Primary ANN-BUS
Figure 2.24 ANN-RLY Board Layout and Connection to FACP
Installation
ANN-RLY
47

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fire-lite alarms mrp-2001eFire-lite alarms mrp-2001c

Table of Contents