Module Assembly Key Point - Optical Engine - Acer X1230S series Service Manual

Hide thumbs Also See for X1230S series:
Table of Contents

Advertisement

Module Assembly Key Point - Optical Engine

1. Light Pipe Module assembly and overfill alignment
1.1 Assembly LP Module to HSG DMD
(3) Assembly two Overfill adjustment screws to HSG DMD (Fig. 1-1).
** Adjustment criteria refer to below item
(4) Assembly "Clip LP" and lock with screw well (Fig. 1-2).
(5) Press CLIP of RE_BKT_LP first, and then push it into the hole (Fig. 1-3).
(6) Placed LP Module on LP datum of "DMD HSG" and adjustment screw well (Fig.1-4).
(7) Assembly "Baffle LP" first (Fig. 1-5-1) & push "Baffle LP" to hook DMD HSG, and then
lock with screw well (Fig. 1-5-2).
1.2 Overfill Adjustment @ LP Module
Overfill Adjustment Criteria:
(1) Pre-assembly 2 adjusting screws. Criteria shown as Fig.1-6.
(2) Alignment Sequence:
a. To adjust "Horizontal Adjustment Screw" firstly, and then "Vertical Adjustment
Screw".
b. Refer to Fig. 1-6.
(3) For Overfill Re-adjustment:
a. Those 2 Adjustment Screws must be released closely to the "Pre-assembly"
positions first.
b. Follow adjustment steps shown in Item 4.6-ii.
Overfill Vertical
Adjustment Screw
Fig. 1-2
Overfill Horizontal
Adjustment Screw
Fig. 1-1
38
Clip LP

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

X1130 seriesX1230 seriesX1235 seriesX1230k series

Table of Contents