Precautions To Take Before Running The Kobra® Cell; Operating The Kobra® Cell; Error Led - R-Biopharm KOBRA CELL Instruction Manual

Table of Contents

Advertisement

Precautions to Take Before
4.5
Running the KOBRA
This device has only to be used with the supplied
power pack.
Always ensure there is a mobile phase flowing
through the KOBRA® CELL before switching on
the current source.
Do not switch on without mobile phase flowing
through the KOBRA® CELL or the membrane will
be damaged.
It is advised to run the mobile phase through the
KOBRA® CELL for 30 minutes prior to analysis.
Always turn off the KOBRA® CELL power pack
before turning off the HPLC pump.
Always use HPLC grade solvents (with minimal
benzene content) from a quality supplier and
maintain fresh supplies of potassium bromide.
Never flush 100 % solvent through the
KOBRA® CELL as this can damage the membrane.
Operating the KOBRA® CELL
4.6
CELL
®
The KOBRA® CELL power pack is turned on by
moving the switch to the 'On' position. To shut
down the device move the switch to the 'Off'
position.

Error LED

4.7
The LED will light up if there is no KOBRA® CELL
attached to the current source.
The LED will also light up when the KOBRA® CELL
is dry and the flow of the current source is
inhibited.
Power Light
Error Light
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

K01

Table of Contents