4. Test procedure: : : :
4.1
All detail related test procedure shall be follow Standard Operation Procedure of SMP
subjected W11-001 Rev.2 issue documentation.
4.2
Test flow shall be follow below statement.
5. Test Result: : : :
5.1
T.1 ~T4 Test results: Pass
5.1.1 Batteries meet requirement regard mass loss was less then 0.1% and voltage loss less
10% relating original situation.
5.1.2 No leakage, No venting, No disassembly, No rupture and no fire.
5.2
T.5 Test result: Pass
5.2.1 All Batteries can meet requirement subjected external temperature does not exceed
℃
170 .
5.2.2 All Batteries no disassembly, no rupture and no fire within six hours
5.3
T.6 Test results: Pass
5.3.1 All cells can meet requirement subjected external temperature does not exceed 170 .
5.3.2 All cells no disassembly and no fire within six hours of this test.
5.4
T.7 Test results: Pass
5.4.1 All batteries can meet no disassembly and no fire within seven days of the test.
All detail evidence will be confirmed follow appendix described.
The information contained herein is the exclusive property of SIMPLO TECHNOLOGY CO., LTD, and shall not be distributed, reproduced, or disclosed in whole
or in part without prior written permission.
This test report is valid only to the items, Invalid for separation using.
,
Page 3 of 5
Control Number : SACU0912004
℃