Draper Scissor Lift SL Operating Instructions Manual
Draper Scissor Lift SL Operating Instructions Manual

Draper Scissor Lift SL Operating Instructions Manual

Video projector lift

Advertisement

Scissor lift Sl Video projector lift by Draper
Important Safety InStructIonS
Read all instructions completely before proceeding.
WARNING/AVERTISSEMENT
DANGER: To reduce risk of shock:
RISK OF ELECTRIC SHOCK. DO NOT OPEN
RISQUE DE CHOC ELECTRIQUE. NE PAS OUVRIR.
1 Always disconnect power from lift before cleaning.
WARNING–To reduce risk of burns, fires, electric shock or injuries to persons:
2 Disconnect power from lift before putting on or taking off parts.
3 Use this lift only for its intended use as described in these instructions.
Do not use attachments not recommended by the manufacturer.
4 Never operate this lift if it has a damaged cord or plug. If it is not working
properly, call your dealer or the manufacturer for assistance/repair.
5 Keep cords away from heated surfaces.
6 Never operate lift with air opening blocked. Keep the air openings free of lint,
hair, and the like.
7 Never drop or insert any object into any opening.
8 Do not use outdoors.
9 Route cords and cables as shown in the instructions.
WARNING: Risk of Electric Shock—connect this product to a
10
properly grounded electrical supply.
Important InStallatIon/operatIng InStructIonS
WARNING: To prevent injury, this apparatus must be securely attached to
the building structure in accordance with the instructions.
Caution: Do not operate Scissor Lift SL without a minimum of 15 lbs. of weight
attached to the pan. Operating without weight may cause cables to unspool.
11 Test lift prior to installation.
Please Note: Packaging must be removed from lift before testing.
12 Follow instructions carefully. Installation contrary to instructions invalidates
warranty.
13 Do not obstruct operation of Scissor Lift SL with fingers or any object.
Serious injury or damage could result.
14 Lift is intended for use with product weighing not more than 100 pounds.
15 Scissor Lift SL is designed to accommodate ceiling suspended equipment.
equipment should not be allowed to rest on optional ceiling closure
during operation (refer to section titled "Installing projector").
16 Entire bottom of unit must be unobstructed to permit proper operation.
Sufficient clearance must be allowed below projector or optional ceiling
closure: 4' for Model SL4, 10' for Model SL10, etc.
17 Unit must be installed level (use a carpenter's level).
18 Unit operates on 115V AC 60 Hz. current. 9.06 amps current draw (2.06
amps for lift, 7 amps for outlet).
19 Verify the show position when testing lift. Make required changes by referring
to adjustment instructions on page 4 of this document.
20 The maintenance/service factory limit setting must not be adjusted to a lower
position than the preset factory limit setting. In addition, Draper does not
recommend setting show position at the maintenance/service position—for
example, if you wish to have 8' show position, order a lift with at least a 10'
maintenance position.
21 When the Scissor lift Sl is to be installed in "other space used for
environmental air" the optional environmental air space housing must
be installed per instructions to isolate the lift from the "other space
used for environmental air."
22 When Scissor Lift SL is not installed in environmental air space housing
and optional ceiling closure, the ALTERNATE wiring for up limit switch may
be used (see Alternate Wiring schematic on page 5).
CAUTION: Before servicing unit, disconnect hardwired control and
any remote control.
Note: Unit has been thoroughly inspected and tested at factory and found
to be operating properly prior to shipment.
Copyright © 2015 Draper Inc.
Form ScissorLiftSL_Inst15-R
Important Safety/Installation/operating Instructions
Save these Instructions
Caution:
Printed in U.S.A.
Electrical Connections
unit operates on 115V ac, 60 Hz. current.
9.06 amps current draw (2.06 amps for lift, 7 amps for outlet).
Opening the electrical box exposes terminals for field connections.
Unit is shipped with internal wiring complete.
Wire to connect unit to power supply should be furnished by installer.
connections should be made in accordance with wiring diagram, and wiring
should comply with national and local electrical codes.
An appropriate disconnect device shall be provided as part of the building
installation. All operating switches should be "off" before power is connected.
Caution: Make sure electrical supply has been disconnected before
attempting to connect Scissor Lift to electricity.
Scissor Lift should be operated and checked prior to installing projector and/or
optional ceiling closure.
Low Voltage Control Switch shown on Page 2 comes with 75' of non-plenum
rated cable and should be plugged in to Control Panel on top frame of lift for
control of the "Up" and "Show" positions.
Momentary Key Switch shown on Page 2 comes with 75' of cable and should be
plugged in to Control Panel on top frame of lift for control of the "Service" position.
1 Based on screen location and projector specifications, determine proper
position for projector installation.
2 Confirm that there is adequate space for installation and operation.
Minimum clearance above ceiling level varies according to Scissor Lift model,
plus height of projector, optional mounting bracket, optional ceiling closure,
and optional Environmental Air Space Housing.
3 Arrange to provide service access to the unit.
4 Maximum lifting capacity is 100 lbs.
As Soon As Scissor Lift Arrives
1 Open carton and inspect for damage.
2 Locate the following parts:
a. the unit itself
B. controls
c. optional equipment:
I. Environmental Air Space Housing,
II. Universal Projector Mount,
III. Closure Panel or Ceiling Finish Kit
(all ship in separate cartons).
3 Test lift prior to installation.
Please Note: Packaging must be removed from lift before testing.
Caution: Beware
of pinch points
If you encounter any difficulties installing or servicing your Scissor Lift SL, call your
dealer or Draper, Inc. in Spiceland, Indiana, 765-987-7999, or fax 765-987-7142.
Planning
Caution:
Beware of pinch points
U.S. Patent
Number
D395,909

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Scissor Lift SL and is the answer not in the manual?

Questions and answers

Summary of Contents for Draper Scissor Lift SL

  • Page 1 Momentary Key Switch shown on Page 2 comes with 75' of cable and should be Caution: Do not operate Scissor Lift SL without a minimum of 15 lbs. of weight plugged in to Control Panel on top frame of lift for control of the "Service" position.
  • Page 2: Operation

    Factory set limit switches stop lift automatically when projector is in “show” position. security (a sound installation practice with overhead equipment). 10 When the Scissor lift Sl is to be installed in “other space used for en- Optional Key Operated Switch—...
  • Page 3: Installing Projector

    Equipment should not be allowed to rest on optional ceiling closure during operation. Figure 3 The Scissor Lift SL has a grounded 115V AC, 60 Hz outlet for projector power supply. Control cables should be laced through our Cable Management System on rear scissor mechanism only.
  • Page 4 A recommended maintenance schedule includes: Installing Optional Ceiling Closure -Cables: If your Scissor Lift SL is equipped with optional ceiling closure, it can be Check for fraying. used as is, or in conjunction with a square of existing ceiling tile.
  • Page 5 Scissor lift Sl by Draper page 5 of 6 Connecting Controls to Data Cable Splitter Board Controls plug into the Data Cable Splitter Board (See diagram below) which is located on the Top Frame on the front side of the lift, using RJ14/6P4C connectors.
  • Page 6: Adjusting Limit Switches

    DoWn position Figure 8 Limit switches for the Scissor Lift SL are preset at the factory. The DoWn limit switch is set for the fully down (maintenance) position for the size lift you have ordered. The limit switch assembly is located inside the lift and behind the Lifting Cable Drum.

Table of Contents