Table 10: Input Rate
Size of Gas Meter Dial
Seconds
for One
One-Half
Revolution
Cu. Ft.
30
60
32
56
34
53
36
50
38
47
40
45
42
43
44
41
46
39
48
37
50
36
52
35
54
33
56
32
58
31
60
30
62
29
64
29
66
29
68
28
70
26
72
25
74
24
76
24
78
23
80
22
L.
Adjust gas input rate to boiler. LP/Propane.
1. Set thermostat to highest setting.
2. Adjust tank regulator for gas valve inlet pressure of
13.5 inches w.c. or less.
3. Gas valve has step opening regulator which initially
opens to 1.4 or 2.5 inch w.c. and steps to full
pressure after approximately 30 seconds. Check
manifold pressure after step has occurred. Adjust gas
valve pressure regulator as necessary for 10.0 inches
w.c. (turn adjustment screw counterclockwise to
decrease manifold pressure, or clockwise to increase
manifold pressure). If 10.0 inches w.c. can not be
attained, check gas valve inlet pressure. If less than
11.0 inches w.c., contact gas supplier for assistance.
M.
Clean Heating System (Steam). A local qualified
water treatment chemical specialist is a suggested
source for recommendations regarding appropriate
chemical compounds and concentrations which are
compatible with local environmental regulations.
One
Two
Five
Cu. Ft.
Cu. Ft.
Cu. Ft.
120
240
600
113
225
563
106
212
529
100
200
500
95
189
474
90
180
450
86
172
430
82
164
410
78
157
391
75
150
375
72
144
360
69
138
346
67
133
333
64
129
321
62
124
310
60
120
300
58
116
290
56
112
281
54
109
273
53
106
265
51
103
257
50
100
250
48
97
243
47
95
237
46
92
231
45
90
225
1. Oil from new piping connections and sediment in
existing piping must be removed from system to
prevent unsteady water line and carry-over of
entrained water into supply main.
a. Fill boiler to normal waterline.
b. Follow Lighting or Operating Instructions to
place boiler in operation. See Figure 48, 49, 50,
or 51.
c. Operate boiler with steam in entire system for
several days to bring system oil and dirt back to
boiler.
d. Drain condensate from drain valve in wet return.
Operate boiler until condensate runs clean.
2. Boil-out boiler.
a. Follow instructions TO TURN OFF GAS TO
APPLIANCE. See Figure 48, 49, 50, or 51.
b. Fill boiler to normal waterline.
c. Remove safety valve.
d. Pour recommended boil-out compound into
boiler through safety valve opening.
e. Reinstall safety valve in Tapping "E" with
spindle in vertical position. See Figures 1 and 2.
f. Follow Lighting or Operating Instructions to
place boiler in operation. See Figure 48, 49, 50,
or 51.
Check controls operation per Paragraphs F to J.
Boil water for at least 5 hours.
g. Follow instructions TO TURN OFF GAS TO
APPLIANCE. See Figure 48, 49, 50, or 51.
Drain boiler and system piping.
h. Remove drain valve. Thoroughly wash boiler
water passages with high pressure spray through
drain valve tapping.
i. Reinstall drain valve in Tapping "F". See
Figures 1 and 2.
3. Second Boil-out for Stubborn Cases. If all oil and
grease is not removed a second boilout using surface
blow-off is necessary.
a. Run 1 NPT pipe from Surface Blow-Off Tapping
"L" to open drain. Do not install shut-off valve or
other restriction. See Figure 2.
b. Fill boiler to top of gauge glass.
c. Remove safety valve.
d. Pour recommended boil-out compound into
boiler through safety valve opening.
e. Reinstall safety valve in Tapping "E" with
spindle in vertical position. See Figures 1 and 2.
f. Follow Lighting or Operating Instructions to
place boiler in operation. See Figure 48, 49, 50,
or 51. Boil water for approximately 5 hours
without producing steam.
g. Open boiler fill shut-off valve to produce steady
trickle of water from surface blow-off pipe.
Continue boil-out for several hours until surface
blow-off water runs clear.