Burnham INDEPENDENCE IN10 CANADA Installation & Service Instructions Manual page 10

Gas - fired boiler
Hide thumbs Also See for INDEPENDENCE IN10 CANADA:
Table of Contents

Advertisement

D.
Install Canopy.
1. Install ½" thick x 1" wide ceramic fiber gasket. See
Figure 7.
Figure 7: Canopy Gasket Installation
2. Position canopy on ceramic fiber gasket. See Figure
8.
Figure 8: Canopy Installation
10
3. Attach canopy using ¼" carriage bolts, nuts, and
E.
Inspect joints between sections. They were factory
sealed. If there are any openings due to shipment or
handling, reseal with boiler putty.
F.
Install Jacket. See Figure 9.
1. Models IN7-IN12 steam boilers: remove 3 inch
2. Raise rear panel under rear flange of canopy and rest
3. Secure both jacket side panels to base with sheet
4. Position front tie bar and secure to jacket side panels
5. Position vestibule panel and secure to side panels
6. Attach Rating Label and Vent Damper Instruction
7. Install top panels by placing over and around outside
8. Install black plastic rings into 1-3/32 inch diameter
Figure 9: Jacket Assembly
washers provided.
diameter knockouts in jacket top panels.
on floor. Position rear panel and secure to jacket side
panels with sheet metal screws. For Models IN10-
IN12, secure jacket upper rear panels to side panels
with sheet metal screws.
metal screws.
with sheet metal screws.
with sheet metal screws.
Label at designated locations on vestibule panel.
of side and rear panels. Seat fully and secure with
sheet metal screws.
holes located below upper louvers of front
removable door.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents