Operator's Manual
Install Digestion Vessels
8.6.1. Open the digestion oven door by pulling it open.
8.6.2. Make sure the vessel tops are open. If they are not
open, press the "Vessel Top" toggle so that they are
in the open position.
8.6.3. Install the digestion vessels into the instrument by sliding them into the guide and setting them into the white
vessel bases. If you are using digestion vessels with ports, make sure the ports are facing forward.
8.6.4. Close the vessel tops by pressing the "Vessel Tops" toggle. You will see the vessel tops descend and seal the
digestion vessels.
8.6.5. Once all four digestion vessels have been installed, press "YES."
Add Internal Standard
8.7.1. If an internal standard is needed, add the
standard into the digestion vessels
through the side port of the vessels.
8.7.2. Screw the red caps onto the vessel ports.
Tighten but do not over tighten.
pg. 34
Rev 1/22/2021
Need help?
Do you have a question about the Flex Analyte Extractor and is the answer not in the manual?
Questions and answers