Technical datasheet
Tumble dryer:
Heating:
Legend:
Optional extras:
UG 8350 box plinth
UM
Miele plinth
Height
Width
Depth
BS
Concrete plinth
Quality and density of concrete must comply with load.
Concrete plinth must be firmly secured to floor!
Recommended height
Minimum height
Width min.
Width:min.
Machine connections:
Electrical
1. Standard voltage (as supplied)
connection
Electrical connection must comply with national regulations.
Connection using multi-pole wall socket in compliance with
IEC/EN 60309 and IEC/EN 60947 is recommended in order to
simplify electrical tests.
If machines are hard-wired, a multi-pole mains switch must be
provided on site.
A wall socket or mains isolator must be accessible after
installation.
Equipotential
Connection with male thread
bonding
with washers and nut.
Accessories to be ordered separately
If necessary, equipotential bonding with good galvanic
contact must be provided in accordance with all appropriate
national and local regulations.
Installationsplan / Installation plan: PT 8331/8333/8335/8337
Datum / Date: 12.01.2011
Abbreviations in bold type:
Connection required
Abbreviations in circle with dashes:
Connection optional or required depending on model version
Frequency
Rated load
Fuse rating
Connection cable, min. cross-section
Cable screw connector
Connection cable (to be ordered separately)
PT 8331/8333/8335/8337
Gas (G)
en - GB
mm
127
mm
900
mm
868
mm
100
mm
50
mm
900
mm
1100
V
1N AC 220 - 240
Hz
50
kW
0.8
A
1 × 10
mm²
3 × 1.5
M 20
mm
10 × 35
M
10
Seite / Page: 8