Wiring The Switches; Wiring The Leds Or Lamps - Honeywell NOTIFIER SCS Series Operation And Installation Manual

Smoke and hvac control station
Table of Contents

Advertisement

The SCS⁄SCE

Wiring the Switches

The connectors and pin assignments used to wire switches to the SCS-8L⁄SCE-8L are shown in Figure 3.19. The switches for each switch
group wired to J1 and J2 must be single pull, double throw, center-off type as shown in Figure 3.19. The center-off position is used for Auto-
matic Control. Switches can be obtained from any company which manufactures UL-listed graphic annunciator panels.
NOTE:
1. The Local Acknowledge/Lamp Test switch wired to J10 must be momentary type.
2. The key-lock switch wired to J11 on the SCS-8L provides access security for all control switches wired to that module. Switches will not
function when the key-lock switch is in its closed position.

Wiring the LEDs or Lamps

The LEDs or Lamps can be powered from 24 VDC or 5 VDC, depending on the load required. Figures 3.21 and 3.22 illustrate connection of
the desired voltage. The following connectors and pin assignments are used to wire LEDs or Lamps to the SCS-8L⁄SCE-8L:
48
Figure 3.19 Switch Wiring for SCS-8L⁄SCE-8L
J6
+24 VDC LED Power
pin 1
pin 2
J8
+5 VDC LED Power
pin 1
pin 2
+24 VDC
+24 VDC
+5 VDC
+5 VDC
SCS Series Manual — P/N 15712:L 7/18/16
SCS-8L⁄SCE-8L Installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scs-8Scs-8l

Table of Contents