Curtis G4 CGC Series User Manual page 9

Digital coffee brewing system
Hide thumbs Also See for G4 CGC Series:
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
Models CGC/CGC1: Setting the Brewer for 220-240 Volt
Operation (cont.)
9
Feed the 220-240 Volt power cable through the strain
relief, into the brewer. The brewer may be wired for
connection directly to a junction box or for use with a
power plug that connects to an electrical outlet meeting
the brewer SPECIFICATIONS.
10 Connect the wires on the power cable to the terminal
block inside the brewer.
11 Tighten the strain relief.
12 Replace the back cover.
Connect the Water Supply
13 Flush the water supply line prior to installation to purge
14
the back of the brewer. Leave the water supply valve
closed until the power is connected.
Electrical Connection
Models CGC/CGC1 - Connected to a Junction Box
WARNING: Turn off power to the junction box at
the circuit breaker panel and lock out and tag the
circuit breaker before connecting the power cable
to the junction box.
15 Connect the power cable wires to the terminals in the
junction box. See the ELECTRICAL SCHEMATIC for
the power supply requirements.
Units Equipped for Connection Using a Power Plug
16 For models CGCE/CGC1E, connect a C20 IEC power
cord (not supplied) compatible with the electrical outlet
WARNING: Connect the power cord only to the
appropriate type and size electrical outlet. If it is
not compatible, either have the cord replaced or
have the electrical outlet upgraded by a licensed
electrician. Do not use an extension cord. Do not
use a power cord/plug that is damaged.
17 Connect the power cord to the appropriate electrical
outlet.
CGC, INSTALLATION INSTRUCTIONS
220 Volt
power cord
Strain
relief
Back of
brewer
C20 connector
(Export versions)
II13
Terminal
block
Back of
brewer
080820C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgc1 seriesCgc13 seriesCgce seriesCgc1e seriesG4 cgc1G4 cgc

Table of Contents