7.3.8

Terminate the cable armouring

The outer sheathing must be stripped to expose the armouring. It is suggested that
between 15mm and 30mm of the inner sheathing Is left above the CET bar. A
further conductor length must also be allowed, sufficient to reach the terminal
blocks via the proper routing.
The cable is inserted in the CET ring and the armoured wires are bent outwards
and down against the ring. A hose clip is then placed over the armoured wires and
tightened up. The cable sleeve must be stripped from the armouring approx. 0 to
2mm below the level of the CET ring. See Figure 50 for details.
The inner sheathing is removed to expose the individual leads, which are connected
to associated terminals, leaving sufficient spare length for re-making off the ends
should this become necessary. Unused leads should be left with sufficient length to
enable them to be connected to any terminal should this subsequently become
necessary.
When the detector loop tails have been terminated, the connection to the Loop
Detector Termination Board must be made with wires twisted together as pairs.
Cables must be identified as to their destinations. Additional cable idents may be
required on specific contracts.
After the site cabling has been terminated, additionally check:
The cable connections to the CET bars are tight
The street cables are terminated correctly into the appropriate connectors.
7.3.9

Cable Testing

Site cabling must be tested against the requirements of the following:
667/HE/20664/000 – Installation and Commissioning Handbook – Installation
Testing (General)
Security classification
Version
Last Editor
Document Name
Copyright © Siemens plc 2020. All Rights Reserved.
667/HE/20664/000 (issue 12 or later) has been updated to include
important information regarding the testing of cables on an ELV site.
Do NOT test ELV site cabling without reference to this document!
Unrestricted
7
manpreet.jeerh
ST950 ICM Handbook
Mobility, Intelligent Traffic Systems
Sopers Lane, Poole, Dorset, BH17 7ER
Page
Status
Date
Document No.
Mobility is a division of Siemens Plc
94 of 154
Issued
January 2020
667/HE/45950/000

Advertisement

Table of Contents
loading

Table of Contents