sugar-valley UVSCENIC UV 16 Quick Instalation Manual

sugar-valley UVSCENIC UV 16 Quick Instalation Manual

Advertisement

QUICK INSTALATION GUIDE
1
DESCRIPTION
With the HYDROLYSIS system we produce active agents like OXYGEN, PEROXIDE, HYDROXYLS, OZONE... on the bases of
Water (H2O - with a minimum conductivity of 1000mS). While the Water passes through the hydrolysis cell these oxidative agents
are produced. This disinfect sand eliminates the organic material present in the water. The generated disinfectants turn back into
H2O while returning to the pool. The salinity provided at start-up (1.5-2.5 g/l) keeps the water in perfect condition with a free chlorine
residual that is imperceptible to the eyes and skin.
UV Scenic supports this process by adding UV light disinfection. the additional exposure of microorganisms and germs to hard UV
light achieves exceptional clean free of chemicals.
Electronic unit
Hydrolysis cell
2
RCA flow detector
3
pH probe
4
Redox probe
5
Mains connection 220v.
6
3.15A fuse
7
250 mA fuse
8
ON-OFF switch
9
Air vent
10
Acid pump connection
11
1.6A fuse
14
Connection U.V.
15
Cell
Vaso ionización (2-4-6e)
1
Hydrolysis cell
1
Electrodos cobre/plata
2
RCA flow detector
2
Tuerca electrodos
3
Cell connection
3
Cable electrodos
4
Flow/gas detector
4
Junta escalonada
5
Cell housing
5
Junta tórica
6
3
2
Optional extras
ph probe
Probe
1
Probe casing
2
Connection housing
3
UVSCENIC
2
4
3
5
6
5
4
1
Redox probe
Probe
1
1
Probe casing
2
Connection housing
3
2
3
9
14
7
8
10
Ultraviolet
U.V. lamp 55W
1
Quartz crystal
2
White ABS Support
3
Power transformer
4
1
2
3
10
11
15
4
3
2
1
Conductivity probe
Probe
1
Probe casing
2
Connection housing
3
3
1
2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UVSCENIC UV 16 and is the answer not in the manual?

Questions and answers

Summary of Contents for sugar-valley UVSCENIC UV 16

  • Page 1 QUICK INSTALATION GUIDE UVSCENIC DESCRIPTION With the HYDROLYSIS system we produce active agents like OXYGEN, PEROXIDE, HYDROXYLS, OZONE… on the bases of Water (H2O - with a minimum conductivity of 1000mS). While the Water passes through the hydrolysis cell these oxidative agents are produced.
  • Page 2 INSTALATION Electrical consumption TITANIUM CELL connection overheating Maximum Recommended Ensure all electrical connections are firmly fixed to avoid false contacts and consumption protection subsequent overheating of system components (Especially concerning the Hydrolysis 180W UV 16 cell with usage above 33A). 228W UV 33 600W...
  • Page 3: Initial Adjustments

    INITIAL ADJUSTMENTS Water adjustments Conductivity adjustments 1.Adjust the alkalinity between 90 and 110 ppm. In poorly conductive waters add 2Kg, of sodium chloride (Salt=NaCl) for every m3 of pool water. 2.Adjust the PH between 7,2 and 7,4 3.Adjust the chlorine between 1 and 1,5 ppm. IN POOLS WHICH RECEIVE LARGE AMOUNTS OF STRONG SUNLIGHT 30gr/m3 OF STABILYSER (Isocyanuric acid) MUST BE ADDED SHOULD the water be supplied from a well: shock...
  • Page 4: Maintenance

    MAINTENANCE Initial maintenance During the first 10-15 days your pool system will require more attention and the following care: 1. CHECK THE PH REMAINS BETWEEN THE IDEAL LEVELS (7,2-7,4). If the PH is unusually unstable AND USES A LOT OF ACID check the alkalinity (Recommended levels between 80 and 125ppm.).
  • Page 5 User menu OXIDATION LEVEL DISPLAY To modify level RECOMMENDED LEVEL: MAXIMUM POWER 100% To confirm and change menu pH SET POINTS DISPLAY To LOWER pH - maximum water pH - CONTROLS THE ACID PUMP (optional equipment) To modify parameters/maximum pH set point RECOMMENDED LEVEL: 7,2 - 7,5 To increase pH - minimum water pH - CONTROLS THE base PUMP (optional equipment) To modify parameters/minimum pH set point...
  • Page 6: Troubleshooting

    Routine Maintenance Under normal conditions, the UV lamps placed inside the UV will last 1 year or 8,000 hours. The upper right UVscenic display (display 1) indicates the total hours of operation of the UV unit. If you change de lamps, use new O-rings. When reassembling the unit, make sure the female threads of the compression fittings and male threads of the main structure are clean.Then replace and firmly hand tighten the compression fittings.

This manual is also suitable for:

Uvscenic uv 33Uvscenic uv 50Uvscenic uv 85Uvscenic uv 125Uvscenic uv 175

Table of Contents